LEVEL

4

STUDY

MASTER BED RM.

Bru

LEVEL

2

LIVING

DINING

DRESSING

LOBBY

LIFT

SLO

SERVANTS BO

KITCHEN

BLO

ACCESS

CORRIDOR

SERVANT'S RM.

1964

LEVEL

3

LEVEL

SECTION OF APARTMENT

Kitchens too are tiled with white glazed tiles to the ceiling and have a white mosaic floor, Sinks are of aluminium.

Lift lobbies have asphalt tile floors and the walls are coved in Formica to the ceiling.

Repulse Bay Towers was complet- ed in November 1963 at a cost of

approximately $3.50 per cubic foot including all fittings.

Architect for the project was Mr. H. S. Luke. The owners and builders are the Paul Y. Construction Co. Ltd.

Sub-contractors and suppliers in-

cluded:

LIFTS: The Jardine Engineering Corp. Ltd. (Schindler).

ELECTRICAL FIXTURES: The British General Electric Co. Ltd.

PLUMBING: The China En- gineers Ltd.

SANITARY FITTINGS ETC.: Berents and Associates (Kohler).

DOOR HARDWARE & LOCKS: Shewan Tomes (Equipment) Ltd. (Schlage).

-LEVEL 2+ LEVEL 14

LEVEL 4 - LEVEL 3

B.R.

BR

B.R.

B

B R.

B. R

BR

B.R

MENT DUCTI

VENT DUCT

¡VENT DUCT.

B. R.

STUDY

BR

BR

STUDY BR

STUDY

STUDY

TYPICAL FLOOR PLAN

ACCESS

CORRIDOR

SER.

SER SER

SER*

SER.

SER

K

K

P

VENT DUct

P

CVENT DUCT

VENT DUCT

L. & D. R

L. & D. R.

L & DR

& DR

TYPICAL FLOOR PLAN

THE HONG KONG & FAR EAST BUILDER-VOLUME 19, NUMBER 3

E

Ə

99

Page 105+