LEVEL
4
STUDY
MASTER BED RM.
Bru
LEVEL
2
LIVING
DINING
DRESSING
LOBBY
LIFT
SLO
SERVANTS BO
KITCHEN
BLO
ACCESS
CORRIDOR
SERVANT'S RM.
1964
LEVEL
3
LEVEL
SECTION OF APARTMENT
Kitchens too are tiled with white glazed tiles to the ceiling and have a white mosaic floor, Sinks are of aluminium.
Lift lobbies have asphalt tile floors and the walls are coved in Formica to the ceiling.
Repulse Bay Towers was complet- ed in November 1963 at a cost of
approximately $3.50 per cubic foot including all fittings.
Architect for the project was Mr. H. S. Luke. The owners and builders are the Paul Y. Construction Co. Ltd.
Sub-contractors and suppliers in-
cluded:
LIFTS: The Jardine Engineering Corp. Ltd. (Schindler).
ELECTRICAL FIXTURES: The British General Electric Co. Ltd.
PLUMBING: The China En- gineers Ltd.
SANITARY FITTINGS ETC.: Berents and Associates (Kohler).
DOOR HARDWARE & LOCKS: Shewan Tomes (Equipment) Ltd. (Schlage).
-LEVEL 2+ LEVEL 14
LEVEL 4 - LEVEL 3
B.R.
BR
B.R.
B
B R.
B. R
BR
B.R
MENT DUCTI
VENT DUCT
¡VENT DUCT.
B. R.
STUDY
BR
BR
STUDY BR
STUDY
STUDY
TYPICAL FLOOR PLAN
ACCESS
CORRIDOR
SER.
SER SER
SER*
SER.
SER
K
K
P
VENT DUct
P
CVENT DUCT
VENT DUCT
L. & D. R
L. & D. R.
L & DR
& DR
TYPICAL FLOOR PLAN
THE HONG KONG & FAR EAST BUILDER-VOLUME 19, NUMBER 3
E
Ə
99
Page 105+
No comments yet.
Private notes are available after approval.