Construction of the whole build- ing in reinforced concrete with brick panel walls. Exterior finish will be in glass mosaic tiling. Floor ing in the shopping arcade will be terrazzo tiles.

Total site area is 7,700 square feet; cost $2,500,000 (not including land but including theatre equip- ment); and the cubic cost works out at $3.80 per cubic foot.

The architect is Mr. C. C. Cheng and the consulting structural en- gineers Harriman Realty Co. Ltd. Main contractor is the Tai Hing Construction Co.

Other sub-contractors pliers include:

and sup-

AIR-CONDITIONING: American Engineering Corporation. (Carrier)

LIFTS: The China Engineers Ltd. (Mitsubishi).

HIGH TENSILE STEEL: Van Shung Chong Hon (Dacon-40)

MOSAIC TILING: Demig Trad ing Co. (Far East) Ltd.

PILING: Paul Lee Engineering Co.

CINEMA EQUIPMENT: Elephant Radio Co. Ltd.

ELECTRICAL: Cheong Hin.

BOUNDARY

LINE

DN

UPPER PART OF SCREEN PLATFORM.

UPPER PART OF AUDITORIUM

GANGWA

GANGWAY

GANGWAY

GANGWAY

THIRD FLOOR PLAN

ابنتين

GROUND FLOOR PLAN

16

E

SCALE

40 FT.

GANG WAY

SCREEN PLATFORM

GANGWAY

GANGWAY

DN

GANGWAY

DN

CANOPY

GANGWAY

BEDRN

LIFT

B.

B.

BED RM.

B.

BED RM.

BED RM.

WAITING

DN

FIRST FLOOR PLAN

ON

CANOPY

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.