KINGS
LOAD
PLODUCTION
MAIN
DC4
SAILO
B
OFFICE WING
UNLIAS KÖNÜ
CAL JÄLKING
13
19
20
FUTURL BUILDING
FLOOR
UTILITY WING
QAA a
TRUCK COVAT
STOCK
ROOM
UNDIS
SISKADI
།
A. RASAGE
REPAIRS & PAINTING
OFFICI WIG
JULL Thes
29
UTILITY WING
30
32
LOOF
93
STOCK ROOM
BASEMENT
1211
21 21 22
ROOT
26
BERTI MAES
To+3213
25
27
SERVICING
& STORAGI
26.
STOCK ACEM
room (19) which has a clear span of 56'0" and an average height of 20'0". Empty and full bottles will be stored on this floor and will be moved as required either on conveyor belts or by fork-lift trucks. The loading platforms (20) are located outside the stock room where the cases of Coco-Cola will be loaded and unloaded to and from trucks, which all must pass a check point (14),
Garaging and repair of trucks and painting of equipment will be carried out in the adjacent single storey buildings. Additional storage space has been provided in this annexe together with toilet and washing facilities and a main hall for the workers. Additional toilet, showers and lockers are provided in the main building on the ground floor of the utility wing (10, 11, 12) for use of sales and production personnel.
Construction on the plant has been proceeding for some time and the servicing and storage annexe is already com- pleted, and in use. The prefabricated steel framing for the stock room (19) is in process of erection and plans are now being finalised for the main production building and utility wing. The completed annexe is an entirely reinforced concrete frame and slab structure with panel walls.
THINK
of the FINISH
before you start
Duro
BRAND
Best Quality
CANADIAN BIRCH PLYWOOD
3-ply
7-ply
Samples & Quotations Upon Request
ALLIED TRADING COMPANY LIMITED
502 Bank of East Asia Bldg. Tel. 24419
Lacquers!
Enamels!
Varnishes!
& Synthetic Finishes
BRUSHING LACQUER
Duro
DURO PAINT MANUFACTURING CO., LTD.
1. CONNAUGHT ROAD. C..
HONG KONG.
"DUROVAR "
TEL 28453.
CABLE ADDRESS
-
50
No comments yet.
Private notes are available after approval.