www
DUCT SHAFT
CONFERENCE ROOM
ON
||ANNOUNCERS
PRODUCERS
First floor
walling to the first and second floors comprising precast concrete wall units and mild steel window units. Internal walls will be of reinforced concrete and brick.
Water tanks and a radio room are placed on the roof of the four-storey block and two radio masts, 40 ft. high, will be erected, one over each stairwell. Completion of the four-
storey block, estimated to cost HK$3.5 million, is scheduled for early January next year. Air condi- tioning and electronic wiring will bring the cost to HK$5 million.
IT TAKES MORE THAN A MIXER AND PUMP TO PRESSURE GROUT A FOUNDATION
Knowing where to use various grouting materials is half the job and knowing how is the other.
PREPAKT has developed and patented chemical admixtures together with special equipment and has available experienced engineering personnel to handle difficult foundation problems.
MEMBER
PREPAKT INTERNATIONAL
Consult us without cost or obligation at any time.
INTRUSION PREPAKT
-
(FAR EAST) LIMITED
FOUNDATION CONTRACTORS 725 Prince's Building, Hong Kong. TELEPHONE 232181
Far East Architect & Builder March, 1968
43