June_1965 — Page 55

Far East Builder 遠東建築雜誌 All

Installation of steam. fuel oil and Engineering Service compressed air services in Queen Mary

Hospital Extension.

$306.206

Construction of eastern half of Water- Chi Fuk loo Road Extension. $340,886

Construction

of Sha Tin tunnel

Co.

ap-

trunk Co.

Laying of 18 in. to 36 in. diameter Wo Hing Construction fresh water and salt water mains-Tsuen Wan Kwai Chung Sup-

ply. $1.467.806

Construction

Winsome Co. (Engin-

proach road-south portal to Lung eers and Builders) Ltd. Cheung Road. Stage 1-site formation

and drainage. $597,150

Dredging works at Wan Chai reclama- Maeda tion Stage I. Sections (4) to (5). Co. Ltd. $483.480

Construction

Demolition of godowns at Government Cheun Hing Co. Dockyard, Yau Ma Tei.

Construction of seawall

Stage II. $1.376.650

$27,000

foundation Yau Wing Co., Ltd.

fronting Cha Kwo Ling Reclamation.

Construction of seawall and reclama- Yau Wing Co. Ltd. tion at Kennedy Town.

$597,280

Construction c-f trunk sewer Wongneichong Road and Morrison Hill

111

Fook Lee & Co.

Supply and installation of 6 passenger The lifts in Resettlement Housing at Tsz Ltd. Wan Shan (Block A-12). $254,500

China Engineers

Road $538.522

I

Lung Cheung Road Development Area Winsome

site formation for section Al. gineer

Co.

(En. Builders)

Supply and installation of 8 passenger The China lifts in Resettlement Housing

Engineers

$3.759,080

Ltd.

(Block Ltd.

4. 5 & 6) at Shek Lei Tsuen Wan, N.T. $412,100

Area "A"'),

Yuen Long interception $1.845.300

sewer.

Sang Lee & Co. (1945)

break Yau Wing Co., Ltd.

Supply and installation of 5 Passenger The China

Engineers

lifts in Low Cost Housing Block 2) Ltd.

at Ngau Tau Kok (Area "A") Kow- loon. $261.900

Construction of married staff quarters Yeu Shing Construc- for Preventive Services. North Point. tion Co. $1.172.687

Provision and fixing of triangulation Wah monuments. boundary stones.

in

Fung Construc- bench tion and Quarry Co.

Hong

marks and picket boxes

Kong.

$16,795

Dredging works at southern waters. Aberdeen. $2.286.050

Supply and installation of 8 passenger The British Generat lifts in Resettlement Housing (Block Electric Co., Ltd. "A" & "B"). at Ham Tin (Area "A"}, Kowloon. $385.000

Installation of Iwo

12,000-gallon oil Wan Hin & Co., Ltd.

storage tanks and supply of the oil

pipeline for Wagian Island. $35,000

Electrical installation at Shum Wan ip Tim Electrical Co. Shan pumping station and staff quar- ters $8.710

NEW ADDRESS

As from June 4, 1965, the address of the Far East Architect & Builder will be 1908 Prince's Building, Hong Kong.

Far East Architect & Builder June, 1965

ZEISSL PILING

24′′ & 20′′ DIA.

CAST-IN-SITU CONCRETE PILES

TUBE EXTERNAL DIA.

NORMAL LOADING CAPACITY

151 TONS

24" DIA.

20" DIA.

105 TONS

Zeissl (Hong Kong) Limited

Piling Site Investigation Engineering

Room 307A, Great China House,

8-8A, Queen's Road Central, Hong Kong.

Telephones: 237282, 220426.

89

Page 55Page 56

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.