Installation of steam. fuel oil and Engineering Service compressed air services in Queen Mary
Hospital Extension.
$306.206
Construction of eastern half of Water- Chi Fuk loo Road Extension. $340,886
Construction
of Sha Tin tunnel
Co.
ap-
trunk Co.
Laying of 18 in. to 36 in. diameter Wo Hing Construction fresh water and salt water mains-Tsuen Wan Kwai Chung Sup-
ply. $1.467.806
Construction
Winsome Co. (Engin-
proach road-south portal to Lung eers and Builders) Ltd. Cheung Road. Stage 1-site formation
and drainage. $597,150
Dredging works at Wan Chai reclama- Maeda tion Stage I. Sections (4) to (5). Co. Ltd. $483.480
Construction
Demolition of godowns at Government Cheun Hing Co. Dockyard, Yau Ma Tei.
Construction of seawall
Stage II. $1.376.650
$27,000
foundation Yau Wing Co., Ltd.
fronting Cha Kwo Ling Reclamation.
Construction of seawall and reclama- Yau Wing Co. Ltd. tion at Kennedy Town.
$597,280
Construction c-f trunk sewer Wongneichong Road and Morrison Hill
111
Fook Lee & Co.
Supply and installation of 6 passenger The lifts in Resettlement Housing at Tsz Ltd. Wan Shan (Block A-12). $254,500
China Engineers
Road $538.522
I
Lung Cheung Road Development Area Winsome
site formation for section Al. gineer
Co.
(En. Builders)
Supply and installation of 8 passenger The China lifts in Resettlement Housing
Engineers
$3.759,080
Ltd.
(Block Ltd.
4. 5 & 6) at Shek Lei Tsuen Wan, N.T. $412,100
Area "A"'),
Yuen Long interception $1.845.300
sewer.
Sang Lee & Co. (1945)
break Yau Wing Co., Ltd.
Supply and installation of 5 Passenger The China
Engineers
lifts in Low Cost Housing Block 2) Ltd.
at Ngau Tau Kok (Area "A") Kow- loon. $261.900
Construction of married staff quarters Yeu Shing Construc- for Preventive Services. North Point. tion Co. $1.172.687
Provision and fixing of triangulation Wah monuments. boundary stones.
in
Fung Construc- bench tion and Quarry Co.
Hong
marks and picket boxes
Kong.
$16,795
Dredging works at southern waters. Aberdeen. $2.286.050
Supply and installation of 8 passenger The British Generat lifts in Resettlement Housing (Block Electric Co., Ltd. "A" & "B"). at Ham Tin (Area "A"}, Kowloon. $385.000
Installation of Iwo
12,000-gallon oil Wan Hin & Co., Ltd.
storage tanks and supply of the oil
pipeline for Wagian Island. $35,000
Electrical installation at Shum Wan ip Tim Electrical Co. Shan pumping station and staff quar- ters $8.710
NEW ADDRESS
As from June 4, 1965, the address of the Far East Architect & Builder will be 1908 Prince's Building, Hong Kong.
Far East Architect & Builder June, 1965
ZEISSL PILING
24′′ & 20′′ DIA.
CAST-IN-SITU CONCRETE PILES
TUBE EXTERNAL DIA.
NORMAL LOADING CAPACITY
151 TONS
24" DIA.
20" DIA.
105 TONS
Zeissl (Hong Kong) Limited
Piling Site Investigation Engineering
Room 307A, Great China House,
8-8A, Queen's Road Central, Hong Kong.
Telephones: 237282, 220426.
89
Page 55Page 56