January_1971 — Page 20

Far East Builder 遠東建築雜誌 All

+

POP PLUG -

+

pool DLINK,

Original de-tension device designed by con-

tractor

3/2

* 55 AT 12 ch.

Failure of de-tension device

De-tension device designed by consulting

engineer

རམ་

ELEVATION

A pourtant

་་་**

-

·

V¿'pourwelk

BLO

ས-39". +

47

14 – SITU

+21

/

L.

39

+-

19

Fig. 3. Sections through inverted T-beams

Da je vnd dere la auseistas que der BR-1019

ELEVATION

PLAN

PLAN

Plán poemas, past permetega kang g pa

ká klima

Fig. 4. Construction sequence and isometric view of joint

16

CAN PRE

A

39-

9

་་་་་

MATRAS *.

DEBELE FLOOR PLANK

14 4 17 9 whe

ASI

V.

T T

J.

masanat na autonoom setustad massa

man per trovand ---

Numbers show sequence of construction

Page 20Page 21

Casting

Stressing

TAL BO

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.