+

POP PLUG -

+

pool DLINK,

Original de-tension device designed by con-

tractor

3/2

* 55 AT 12 ch.

Failure of de-tension device

De-tension device designed by consulting

engineer

རམ་

ELEVATION

A pourtant

་་་**

-

·

V¿'pourwelk

BLO

ས-39". +

47

14 – SITU

+21

/

L.

39

+-

19

Fig. 3. Sections through inverted T-beams

Da je vnd dere la auseistas que der BR-1019

ELEVATION

PLAN

PLAN

Plán poemas, past permetega kang g pa

ká klima

Fig. 4. Construction sequence and isometric view of joint

16

CAN PRE

A

39-

9

་་་་་

MATRAS *.

DEBELE FLOOR PLANK

14 4 17 9 whe

ASI

V.

T T

J.

masanat na autonoom setustad massa

man per trovand ---

Numbers show sequence of construction

Page 20Page 21

Casting

Stressing

TAL BO

Share This Page