Moulds fed from bottom discharge buckets
FUK LOI ESTATE PHASE I & II COMPLETED
GUIL
Clamping a wall unit
Welding a joint between floor pane's
Authority's point of view, emphasis has been placed in the past on faith- fully following a design planned for traditional methods of construction and much can be learned from this pilot scheme about precast produc- tion methods and new design possi- bilities.
The true value of the experiment, apart from providing additional ac- commodation, is in applying what has been successfully carried out else where in the world to local conditions and in training local staff to handle the plant, with the ultimate object of finding out whether this or similar systems could be economically ap plied to large scale housing schemes with better and less costly results than those being achieved by conventional building methods.
Aerial view of casting yard with mixing plant at top and stacking area at bottom right
CASTLE
PEAK
ROAD
CAR PARKING
CON C. BATCHING PLANT-
TRACKS
FOR
TRAVELLING GANTRY
STORAGE YARDİ
PANELS
AGGREGATES
SITE OFFICE
WORKSHOPS
-BOILER HOUSE
TRACKS FOR TRAVELLING GANTRY
TRACKS FOR TELESCOPIC -TOWER CRANE
HOI PA STREET
FUK LOI
ESTATE
PHASE
II a
TAI
OH
ROAD
Far East Architect & Builder August, 1966