40

Moulds fed from bottom discharge buckets

FUK LOI ESTATE PHASE I & II COMPLETED

GUIL

Clamping a wall unit

Welding a joint between floor pane's

Authority's point of view, emphasis has been placed in the past on faith- fully following a design planned for traditional methods of construction and much can be learned from this pilot scheme about precast produc- tion methods and new design possi- bilities.

The true value of the experiment, apart from providing additional ac- commodation, is in applying what has been successfully carried out else where in the world to local conditions and in training local staff to handle the plant, with the ultimate object of finding out whether this or similar systems could be economically ap plied to large scale housing schemes with better and less costly results than those being achieved by conventional building methods.

Aerial view of casting yard with mixing plant at top and stacking area at bottom right

CASTLE

PEAK

ROAD

CAR PARKING

CON C. BATCHING PLANT-

TRACKS

FOR

TRAVELLING GANTRY

STORAGE YARDİ

PANELS

AGGREGATES

SITE OFFICE

WORKSHOPS

-BOILER HOUSE

TRACKS FOR TRAVELLING GANTRY

TRACKS FOR TELESCOPIC -TOWER CRANE

HOI PA STREET

FUK LOI

ESTATE

PHASE

II a

TAI

OH

ROAD

Far East Architect & Builder August, 1966