ADVERTISEMENT
For Perfect Safety
use
1084A
Raymond Concrete Pile Foundations
SASSCOM BUILDING: SHANGHAI, CHIVA
106,853 LBS. TEST ON
ONE BAYHONE COMPOSITE PILE
KUNG FU, ONE CANČJETE SESTÝRÐ.
TOTAL LENDER WE FILE
SETTLEMENT ONLY
PENURI, FALKEN E FURNEY --38095672
TOL MANCHER" "HAGAVATIES","
藏
2 k
#
CATHAY HOTEL,
Shanghai, China.
One Raymond Composite Pile 62′ 0′′ long (22′ 0′′ Concrete section super-imposed on 40' 0" wood section) under test-load of 106,955 lbs. settled 9/32nd of an inch.
Amongst some of the buildings resting on Raymond Concrete Pile Foundations are :-
CATHAY HOTEL, Shanghai.
ST. LUKE'S HOSPITAL, Tokyo, Japan. SHIBAURA ENGINEERING WORKS,
Tsurumi, Japan.
ANSHAN STEEL WORKS,
Anshan, South Manchuria.
FUSHUN COLLIERY Co.,
Fushun, South Manchuria.
GLOUCESTER BUILDING, Hongkong.
CENTRAL THEATRE, Hongkong. NEW SUN COMPANY, Hongkong. NGAUSHIWAN GAOL, Hongkong. HONGKONG ELECTRIC Co.'s NORTH POINT PLANT, Hongkong. NATIONAL CITY BANK Building,
Hongkong.
LYEMUN BUILDING, Kowloon. CU-UNJIENG BUILDING, Manila.
Licensees:-
The Hongkong Excavation, Pile Driving & Construction Co., Ltd.
Telephones
{
26667
26668
Powell's Building,
HONGKONG.
No comments yet.
Private notes are available after approval.