ADVERTISEMENT

For Perfect Safety

use

1084A

Raymond Concrete Pile Foundations

SASSCOM BUILDING: SHANGHAI, CHIVA

106,853 LBS. TEST ON

ONE BAYHONE COMPOSITE PILE

KUNG FU, ONE CANČJETE SESTÝRÐ.

TOTAL LENDER WE FILE

SETTLEMENT ONLY

PENURI, FALKEN E FURNEY --38095672

TOL MANCHER" "HAGAVATIES","

2 k

#

CATHAY HOTEL,

Shanghai, China.

One Raymond Composite Pile 62′ 0′′ long (22′ 0′′ Concrete section super-imposed on 40' 0" wood section) under test-load of 106,955 lbs. settled 9/32nd of an inch.

Amongst some of the buildings resting on Raymond Concrete Pile Foundations are :-

CATHAY HOTEL, Shanghai.

ST. LUKE'S HOSPITAL, Tokyo, Japan. SHIBAURA ENGINEERING WORKS,

Tsurumi, Japan.

ANSHAN STEEL WORKS,

Anshan, South Manchuria.

FUSHUN COLLIERY Co.,

Fushun, South Manchuria.

GLOUCESTER BUILDING, Hongkong.

CENTRAL THEATRE, Hongkong. NEW SUN COMPANY, Hongkong. NGAUSHIWAN GAOL, Hongkong. HONGKONG ELECTRIC Co.'s NORTH POINT PLANT, Hongkong. NATIONAL CITY BANK Building,

Hongkong.

LYEMUN BUILDING, Kowloon. CU-UNJIENG BUILDING, Manila.

Licensees:-

The Hongkong Excavation, Pile Driving & Construction Co., Ltd.

Telephones

{

26667

26668

Powell's Building,

HONGKONG.

Share This Page