XN000022-1994-10-28 — Page 24

Daily Information Bulletin 新聞公報 All

22

FRIDAY, OCTOBER 28, 1994

FOOTBRIDGE PLANNED FOR LEI YUE MUN ROAD

THE GOVERNMENT IS PROPOSING TO BUILD A FOOTBRIDGE YUE MUN ROAD AT TSUI PING ROAD.

ACROSS LEI

THUS CONGESTED KWUN TONG

THE FOOTBRIDGE IS TO REPLACE THE EXISTING SIGNAL-CONTROLLED CROSSING AT THE JUNCTION OF TSUI PING ROAD AND LEI YUE MUN ROAD,

THE VEHICULAR

THE TRAFFIC FLOW ON IMPROVING ROAD/LEI YUE MUN ROAD.

IT WILL LINK TSUI PING ESTATE AND THE

YUE ROAD/LEI ON THE NORTHERN SIDE OF KWUN TONG INDUSTRIAL AREA ON THE SOUTH.

RECREATIONAL FACILITIES

MUN ROAD WITH

THE

THE PROPOSAL INCLUDES THE CONSTRUCTION OF A OVER THE PARTIALLY DECKED TSUI PING NULLAH.

STEEL FOOTBRIDGE

A

END OF

THE FOOTBRIDGE WILL SPAN OVER LEI YUE MUN ROAD AND WILL HAVE STEEL ROOF. A RAMP AND A STAIRCASE WILL BE PROVIDED AT EACH THE FOOTBRIDGE TO FACILITATE PEDESTRAIN TRAFFIC.

THE EXTENT OF THE WORKS WAS GAZETTED TODAY (FRIDAY).

THE PROJECT IS SCHEDULED TO BEGIN IN APRIL NEXT YEAR AND TAKE ABOUT 21 MONTHS TO COMPLETE.

THE NOTICE CAN BE SEEN ON NOTICE BOARDS POSTED NEAR THE THE PLAN AND SCHEME OF THE WORKS MAY BE INSPECTED AT:

BOTH,

HARBOUR

BUILDING,

38

WILL

SITE.

SECVICES

PIER

ROAD,

* CENTRAL AND WESTERN DISTRICT OFFICE, PUBLIC ENQUIRY

CENTRE,

FLOOR, GROUND CENTRAL, HONG KONG;

* DISTRICT LANDS OFFICE, KOWLOON EAST, 10TH FLOOR, YAU CAR PARK BUILDING, 250 SHANGHAI STREET, KOWLOON; AND

* KWUN TONG DISTRICT OFFICE, KWUN TONG DISTRICT BRANCH FOURTH BUILDING, TUNG YAN STREET, FIRST, THIRD AND KOWLOON.

MA TEI

OFFICES FLOORS,

THE USE, OR ANY PERSON WHO WISHES TO OBJECT TO THE WORKS OR

FROM THE IS REQUIRED TO ADDRESS HIS OBJECTION WITHIN 60 DAYS

FOR TRANSPORT, CENTRAL DATE OF NOTICE IN WRITING TO THE SECRETARY GOVERNMENT OFFICES, EAST WING, SECOND FLOOR, LOWER ALBERT ROAD, KONG, ON OR BEFORE DECEMBER 27 THIS YEAR.

HONG

/23

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.