22
FRIDAY, OCTOBER 28, 1994
FOOTBRIDGE PLANNED FOR LEI YUE MUN ROAD
THE GOVERNMENT IS PROPOSING TO BUILD A FOOTBRIDGE YUE MUN ROAD AT TSUI PING ROAD.
ACROSS LEI
THUS CONGESTED KWUN TONG
THE FOOTBRIDGE IS TO REPLACE THE EXISTING SIGNAL-CONTROLLED CROSSING AT THE JUNCTION OF TSUI PING ROAD AND LEI YUE MUN ROAD,
THE VEHICULAR
THE TRAFFIC FLOW ON IMPROVING ROAD/LEI YUE MUN ROAD.
IT WILL LINK TSUI PING ESTATE AND THE
YUE ROAD/LEI ON THE NORTHERN SIDE OF KWUN TONG INDUSTRIAL AREA ON THE SOUTH.
RECREATIONAL FACILITIES
MUN ROAD WITH
THE
THE PROPOSAL INCLUDES THE CONSTRUCTION OF A OVER THE PARTIALLY DECKED TSUI PING NULLAH.
STEEL FOOTBRIDGE
A
END OF
THE FOOTBRIDGE WILL SPAN OVER LEI YUE MUN ROAD AND WILL HAVE STEEL ROOF. A RAMP AND A STAIRCASE WILL BE PROVIDED AT EACH THE FOOTBRIDGE TO FACILITATE PEDESTRAIN TRAFFIC.
THE EXTENT OF THE WORKS WAS GAZETTED TODAY (FRIDAY).
THE PROJECT IS SCHEDULED TO BEGIN IN APRIL NEXT YEAR AND TAKE ABOUT 21 MONTHS TO COMPLETE.
THE NOTICE CAN BE SEEN ON NOTICE BOARDS POSTED NEAR THE THE PLAN AND SCHEME OF THE WORKS MAY BE INSPECTED AT:
BOTH,
HARBOUR
BUILDING,
38
WILL
SITE.
SECVICES
PIER
ROAD,
* CENTRAL AND WESTERN DISTRICT OFFICE, PUBLIC ENQUIRY
CENTRE,
FLOOR, GROUND CENTRAL, HONG KONG;
* DISTRICT LANDS OFFICE, KOWLOON EAST, 10TH FLOOR, YAU CAR PARK BUILDING, 250 SHANGHAI STREET, KOWLOON; AND
* KWUN TONG DISTRICT OFFICE, KWUN TONG DISTRICT BRANCH FOURTH BUILDING, TUNG YAN STREET, FIRST, THIRD AND KOWLOON.
MA TEI
OFFICES FLOORS,
THE USE, OR ANY PERSON WHO WISHES TO OBJECT TO THE WORKS OR
FROM THE IS REQUIRED TO ADDRESS HIS OBJECTION WITHIN 60 DAYS
FOR TRANSPORT, CENTRAL DATE OF NOTICE IN WRITING TO THE SECRETARY GOVERNMENT OFFICES, EAST WING, SECOND FLOOR, LOWER ALBERT ROAD, KONG, ON OR BEFORE DECEMBER 27 THIS YEAR.
HONG
/23