21
THURSDAY, MAY 24, 1990
TRAFFIC ARRANGEMENT FOR ISLAND EASTERN CORRIDOR
**
#
THAT ΤΟ FACILITATE NOISE
ISLAND
LEADING FROM
THE TRANSPORT DEPARTMENT ANNOUNCES REDUCING HIGHWAY SURFACING WORKS, THE SLIP-ROAD EASTERN CORRIDOR EASTBOUND TO JAVA ROAD WILL BE CLOSED FROM 9 SATURDAY (MAY 26) TO 5 AM ON MONDAY (MAY 28).
PM ON
MOTORISTS MAY USE THE SLIP-ROAD LEADING FROM ISLAND EASTERN CORRIDOR EASTBOUND TO TONG SHUI ROAD OR THE SLIP-ROAD LEADING FROM ISLAND EASTERN CORRIDOR EASTBOUND TO TAIKOO WAN ROAD.
URBAN CLEARWAYS IN HUNG HOM
* * *
THE TRANSPORT DEPARTMENT ANNOUNCES THAT FROM 10 AM ON SATURDAY (MAY 26), THE NORTHERN KERBSIDE LANE OF TAI WAN ROAD, IN HUNG HOM, FROM ITS JUNCTION WITH MA TAU WAI ROAD TO A POINT ABOUT 108 METRES. EAST OF THE SAME JUNCTION WILL BE DESIGNATED AN URBAN CLEARWAY 24 HOURS DAILY.
ALSO, THE EXISTING 7 AM TO 7 PM DAILY URBAN CLEARWAY ON THE NORTHERN KERBSIDE LANE OF HOK YUEN STREET, FROM ITS JUNCTION WITH MA TAU WAI ROAD TO A POINT ABOUT 38 METRES WEST OF THE SAME JUNCTION WILL BE EXTENDED WESTWARD FOR ABOUT 12 METRES.
NO VEHICLES EXCEPT FRANCHISED BUSES WILL BE ALLOWED ΤΟ STOP FOR PASSENGERS OR GOODS IN THE URBAN CLEARWAYS.
—
0
TEMPORARY LANE CLOSURES ON TOLO HIGHWAY
ANNOUNCES
THE TRANSPORT DEPARTMENT
THAT ΤΟ FACILITATE ROAD IN TAI PO MAINTENANCE WORKS, THE FOLLOWING SECTIONS OF TOLO HIGHWAY WILL BE PARTIALLY CLOSED DURING THE PERIODS SPECIFIED BELOW:
t
ON SATURDAY (MAY 26), A SECTION OF ABOUT 1.7 KILOMETRES THE SLOW LANE OF TOLO HIGHWAY NORTHBOUND NEAR PAK SHEK BRIDGE.
ON MAY 29 AND 30, A SECTION OF ABOUT 1.8 KILOMETRES OUTERMOST LANE OF TOLO HIGHWAY SOUTHBOUND NEAR ISLAND INTERCHANGE.
OF
KOK
OF
THE HOUSE
ON MAY 31, A SECTION OF ABOUT 1.8 LANE OF TOLO HIGHWAY NORTHBOUND INTERCHANGE.
KILOMETRES
NEAR
OF THE SLOW 1SLAND HOUSE
MOTORIST'S ARE URGED ΤΟ DRIVE WITH CARE AND PATIENCE. APPROPRIATE TRAFFIC AIDS WILL BE PROVIDED TO GUIDE THEM.
0
-
/22
No comments yet.
Private notes are available after approval.