WEDNESDAY. AUGUST 30, 1989
$84M CONTRACT FOR BUILDING ACCESS ROAD TO LANDFILL
FOR
THE GOVERNMENT
CONSTRUCTING
HAS
A SOUTHERN
AWARDED
MILLION $84 A
TO THE ACCESS ROAD TERRITORIES LANDFILL AT NIM WAN.
CONTRACT
PROPOSED
WEST NEW
REPRESENTATIVE TIANZHONG,
OF
TODAY SIGNED THE CONTRACT WAS
TERRITORIES, NEW HIGHWAY ENGINEER.
CHINA HARBOURS
BY (WEDNESDAY) MR KWONG ENGINEERING
THE REGIONAL
AND HON-SANG.
A COMPANY, MR FANG
FOR DISPOSAL UPON THE
MR KWONG SAID THE NIM WAN LANDFILL WAS ESSENTIAL OF SOLID WASTE GENERATED FROM THE NEW TERRITORIES WEST AREA EXHAUSTION OF THE PRESENT CONTROLLED TIP AT PILLAR POINT VALLEY,
A SUB-STANDARD SINGLE AND THERE WAS NO
HE SAID THAT AT PRESENT THERE WAS ONLY LANE ROAD CONNECTING TAP SHEK KOK AND LUNG KWU TAN, PROPER VEHICULAR ACCESS TO THE PROPOSED LANDFILL AT NIM WAN.
AN IMPORTANT ON COMPLETION, THE NEW ACCESS ROAD WOULD PROVIDE
IMPROVE THE NIM
AND AND
LANDFILL, WAN LINK BETWEEN TAP SHEK KOK PEDESTRIAN TRAFFIC IN LUNG KWU TAN AND LUNG KWU SHEUNG TAN IN TERMS OF SAFETY AND CONVENIENCE, HE SAID.
THE CONSTRUCTION OF A THE CONTRACT COVERS MAINLY
KOK WIDE TWO-LANE CARRIAGEWAY WITH FOOTPATHS FROM TAP SHEK KOK AT NIM WAN.
ΤΟ
7.3-METRE TSANG
OF CONSTRUCITON
RETAINING
WALLS.
BOX
CULVERTS,
ASSOCIATED
SLOPE WORKS AND DRAINAGE WORKS WILL ALSO BE INCLUDED.
CONSTRUCTION WILL START THIS MONTHS TO COMPLETE.
MONTH AND WILL TAKE ABOUT 30
THE HIGHWAYS DEPARTMENT DESIGNED SUPERVISE ITS CONSTRUCTION.
THE PROJECT AND WILL ALSO
FEE REMISSION FOR SENIOR SECONDARY STUDENTS
A SITUATION OF GENUINE SECONDARY 4 TO 7 STUDENTS WHO ARE IN
то INVITED
APPLY FOR
ASSISTANCE FINANCIAL FINANCIAL HARDSHIP ARE UNDER THE FEE REMISSION SCHEME RUN BY THE EDUCATION DEPARTMENT.
THE SCHEME IS AVAILABLE TO STUDENTS OF AND PRIVATE SCHOOLS WITH ASSISTED PLACES.
PUBLIC SECTOR SCHOOLS
HALF-FREE PLACE WILL BE
SYSTEM A RECKONER
AWARDED TO AN APPLICANT
FULL GRANT. THREE-QUARTER FREE OR A
ACCORDANCE
IN
WITH
ASSESS THE FAMILY'S INCOME.
TO
/APPLICATION FORMS
No comments yet.
Private notes are available after approval.