WEDNESDAY. AUGUST 30, 1989

$84M CONTRACT FOR BUILDING ACCESS ROAD TO LANDFILL

FOR

THE GOVERNMENT

CONSTRUCTING

HAS

A SOUTHERN

AWARDED

MILLION $84 A

TO THE ACCESS ROAD TERRITORIES LANDFILL AT NIM WAN.

CONTRACT

PROPOSED

WEST NEW

REPRESENTATIVE TIANZHONG,

OF

TODAY SIGNED THE CONTRACT WAS

TERRITORIES, NEW HIGHWAY ENGINEER.

CHINA HARBOURS

BY (WEDNESDAY) MR KWONG ENGINEERING

THE REGIONAL

AND HON-SANG.

A COMPANY, MR FANG

FOR DISPOSAL UPON THE

MR KWONG SAID THE NIM WAN LANDFILL WAS ESSENTIAL OF SOLID WASTE GENERATED FROM THE NEW TERRITORIES WEST AREA EXHAUSTION OF THE PRESENT CONTROLLED TIP AT PILLAR POINT VALLEY,

A SUB-STANDARD SINGLE AND THERE WAS NO

HE SAID THAT AT PRESENT THERE WAS ONLY LANE ROAD CONNECTING TAP SHEK KOK AND LUNG KWU TAN, PROPER VEHICULAR ACCESS TO THE PROPOSED LANDFILL AT NIM WAN.

AN IMPORTANT ON COMPLETION, THE NEW ACCESS ROAD WOULD PROVIDE

IMPROVE THE NIM

AND AND

LANDFILL, WAN LINK BETWEEN TAP SHEK KOK PEDESTRIAN TRAFFIC IN LUNG KWU TAN AND LUNG KWU SHEUNG TAN IN TERMS OF SAFETY AND CONVENIENCE, HE SAID.

THE CONSTRUCTION OF A THE CONTRACT COVERS MAINLY

KOK WIDE TWO-LANE CARRIAGEWAY WITH FOOTPATHS FROM TAP SHEK KOK AT NIM WAN.

ΤΟ

7.3-METRE TSANG

OF CONSTRUCITON

RETAINING

WALLS.

BOX

CULVERTS,

ASSOCIATED

SLOPE WORKS AND DRAINAGE WORKS WILL ALSO BE INCLUDED.

CONSTRUCTION WILL START THIS MONTHS TO COMPLETE.

MONTH AND WILL TAKE ABOUT 30

THE HIGHWAYS DEPARTMENT DESIGNED SUPERVISE ITS CONSTRUCTION.

THE PROJECT AND WILL ALSO

FEE REMISSION FOR SENIOR SECONDARY STUDENTS

A SITUATION OF GENUINE SECONDARY 4 TO 7 STUDENTS WHO ARE IN

то INVITED

APPLY FOR

ASSISTANCE FINANCIAL FINANCIAL HARDSHIP ARE UNDER THE FEE REMISSION SCHEME RUN BY THE EDUCATION DEPARTMENT.

THE SCHEME IS AVAILABLE TO STUDENTS OF AND PRIVATE SCHOOLS WITH ASSISTED PLACES.

PUBLIC SECTOR SCHOOLS

HALF-FREE PLACE WILL BE

SYSTEM A RECKONER

AWARDED TO AN APPLICANT

FULL GRANT. THREE-QUARTER FREE OR A

ACCORDANCE

IN

WITH

ASSESS THE FAMILY'S INCOME.

TO

/APPLICATION FORMS

Share This Page