19
SUNDAY, FEBRUARY 12, 1989
TEMPORARY LANE CLOSURE OF HUNG MUI KUK ROAD
*
THAT THE
MIDDLE LANE OF JUNCTION WITH CHUNG BE
THE TRANSPORT DEPARTMENT ANNOUNCED HUNG MUI KUK ROAD WESTBOUND IN SHA TIN FROM ITS PAK ROAD TO A POINT ABOUT 50 METRES EAST OF THE SAME JUNCTION WILL
FOR ROAD MAINTENANCE CLOSED FROM WEDNESDAY (FEBRUARY 15) TO MARCH 5 WORKS.
THE
CLOSURE, MOTORISTS ARE
AS CONGESTION IS EXPECTED DURING ADVISED NOT TO USE THIS SECTION OF HUNG MUI KUK ROAD.
APPROPRIATE TRAFFIC AIDS WILL BE PROVIDED TO GUIDE MOTORISTS.
SPECIAL TRAFFIC ARRANGEMENTS FOR BRIDGE IMPROVEMENT WORKS
FACILITATE THE TRANSPORT DEPARTMENT REMINDED MOTORISTS THAT TO
TEMPORARY TRAFFIC THE STAGE II IMPROVEMENT WORKS OF TSING YI BRIDGE,
BE IMPLEMENTED BETWEEN 8 PM AND ARRANGEMENTS WILL
5.40 AM THE FOLLOWING DAY DAILY FROM TOMORROW (MONDAY) FOR ABOUT FIVE MONTHS,
ROAD TAI KWAI TSING ROAD BETWEEN ITS JUNCTIONS WITH KWAI
INCLUDING TSING YI TSING YI HEUNG SZE WUI ROAD ROUNDABOUT, WILL BE CLOSED TO TRAFFIC.
AND BRIDGE,
A SECTION
OF TSING
YI HEUNG SZE WUI HEUNG SZE WUI
ROUNDABOUT, ROAD
AND SOUTHBOUND
ROAD
CONNECTING SOUTHBOUND TSING YI TSING YI ROAD, WILL BE RE-OPENED TO TRAFFIC AT THE SAME TIME.
DIVERTED VIA KWAI
TSING ROAD TRAFFIC ON KWAI
TSING ROUNDABOUT, ROUNDABOUT AND TSING TSUEN BRIDGE.
HEADING FOR TSUEN WAN
TSING ROAD,
YI WILL BE TEXACO ROAD
TRAVELLING TO KWAI ROUNDABOUT, TSUEN WAN ROAD AND KWAI
VEHICLES FROM TSING YI HEUNG SŻE WUI ROAD CHUNG WILL BE DIVERTED VIA FUNG SHU WO ROAD, TAM KON SHAN TSING TSUEN BRIDGE, TEXACO ROAD ROUNDABOUT, TSING ROUNDABOUT.
88C AND 88M
IN ADDITION, GREEN MINIBUS ROUTES 88B, DIVERTED VIA TSING YI HEUNG SZE WUI ROAD AND FUNG SHU WO ROAD.
AREA
WILL BE
BE RELOCATED FROM THE TERMINATING POINT OF GMB ROUTE 88 WILL
MEI TO CHUNG
ROAD DURING FUNG SHU WO TEMPORARY HOUSING
THE BRIDGE CLOSURE. THE ROUTE WILL THEN BE DIVERTED VIA CHEUNG ON ESTATE, TSING TSUEN BRIDGE AND TSUEN WAN ROAD.
/GMB CIRCULAR
Page 20Page 21
No comments yet.
Private notes are available after approval.