19

SUNDAY, FEBRUARY 12, 1989

TEMPORARY LANE CLOSURE OF HUNG MUI KUK ROAD

*

THAT THE

MIDDLE LANE OF JUNCTION WITH CHUNG BE

THE TRANSPORT DEPARTMENT ANNOUNCED HUNG MUI KUK ROAD WESTBOUND IN SHA TIN FROM ITS PAK ROAD TO A POINT ABOUT 50 METRES EAST OF THE SAME JUNCTION WILL

FOR ROAD MAINTENANCE CLOSED FROM WEDNESDAY (FEBRUARY 15) TO MARCH 5 WORKS.

THE

CLOSURE, MOTORISTS ARE

AS CONGESTION IS EXPECTED DURING ADVISED NOT TO USE THIS SECTION OF HUNG MUI KUK ROAD.

APPROPRIATE TRAFFIC AIDS WILL BE PROVIDED TO GUIDE MOTORISTS.

SPECIAL TRAFFIC ARRANGEMENTS FOR BRIDGE IMPROVEMENT WORKS

FACILITATE THE TRANSPORT DEPARTMENT REMINDED MOTORISTS THAT TO

TEMPORARY TRAFFIC THE STAGE II IMPROVEMENT WORKS OF TSING YI BRIDGE,

BE IMPLEMENTED BETWEEN 8 PM AND ARRANGEMENTS WILL

5.40 AM THE FOLLOWING DAY DAILY FROM TOMORROW (MONDAY) FOR ABOUT FIVE MONTHS,

ROAD TAI KWAI TSING ROAD BETWEEN ITS JUNCTIONS WITH KWAI

INCLUDING TSING YI TSING YI HEUNG SZE WUI ROAD ROUNDABOUT, WILL BE CLOSED TO TRAFFIC.

AND BRIDGE,

A SECTION

OF TSING

YI HEUNG SZE WUI HEUNG SZE WUI

ROUNDABOUT, ROAD

AND SOUTHBOUND

ROAD

CONNECTING SOUTHBOUND TSING YI TSING YI ROAD, WILL BE RE-OPENED TO TRAFFIC AT THE SAME TIME.

DIVERTED VIA KWAI

TSING ROAD TRAFFIC ON KWAI

TSING ROUNDABOUT, ROUNDABOUT AND TSING TSUEN BRIDGE.

HEADING FOR TSUEN WAN

TSING ROAD,

YI WILL BE TEXACO ROAD

TRAVELLING TO KWAI ROUNDABOUT, TSUEN WAN ROAD AND KWAI

VEHICLES FROM TSING YI HEUNG SŻE WUI ROAD CHUNG WILL BE DIVERTED VIA FUNG SHU WO ROAD, TAM KON SHAN TSING TSUEN BRIDGE, TEXACO ROAD ROUNDABOUT, TSING ROUNDABOUT.

88C AND 88M

IN ADDITION, GREEN MINIBUS ROUTES 88B, DIVERTED VIA TSING YI HEUNG SZE WUI ROAD AND FUNG SHU WO ROAD.

AREA

WILL BE

BE RELOCATED FROM THE TERMINATING POINT OF GMB ROUTE 88 WILL

MEI TO CHUNG

ROAD DURING FUNG SHU WO TEMPORARY HOUSING

THE BRIDGE CLOSURE. THE ROUTE WILL THEN BE DIVERTED VIA CHEUNG ON ESTATE, TSING TSUEN BRIDGE AND TSUEN WAN ROAD.

/GMB CIRCULAR

Page 20Page 21

Share This Page