XN000022-1989-01-14 — Page 8

Daily Information Bulletin 新聞公報 All

7

SATURDAY, JANUARY 14, 1989

ΤΟ

DESIGN WILL HAVE AN OPEN-ENDED THE PROPOSED NEW SYSTEM

STORED AND FACILITATE SUBSEQUENT CHANGES TO THE TYPES OF INFORMATION

SYSTEM, THE WILL INTERFACE WITH A FULLY INTEGRATED CRIME INFORMATION

SYSTEM AND THE CRIMINAL ENHANCED

AND CENTROL COMPUTER INTELLIGENCE COMPUTER SYSTEM NOW UNDER DEVELOPMENT.

COMMAND

THE USER OF ADDITIONAL ADVANTAGES WILL BE AN AVAILABILITY TO

A WORKLOAD OF OF SUPPORTING

40,000 AND A CAPABILITY TRANSACTIONS A DAY WITH A PEAK LOAD OF 6,500 TRANSACTIONS AN HOUR.

99.5%

MILLION

FOR THE AND DISASTER

ANOTHER $5.4 THE

APPROVED COMMITTEE

INVESTIGATION THE MAJOR INCIDENT COMPUTERISATION OF SEPPORT SYSTEM WHICH IS CURRENTLY OPERATED ON A MANUAL BASIS.

OF EXPENDITURE

ABOUT $824,000 FOR THE

A NON-RECURRENT MEMBERS ALSO ENDORSED 35.5 MILLION AND AN ANNUAL RECURRENT EXPENDITURE OF PROJECT.

COMPUTER ON-LINE BE A STAND-ALONE THE PROPOSED SYSTEM WILL

MAJOR

AND INCIDENT INVESTIGATION SYSTEM WHICH CAN BE USED FOR BOTH

FOR ACCESS MAJOR DISASTER SUPPORT FUNCTIONS, TO BE LOCATED CENTRALLY BY USER UNITS THROUGH VISUAL DISPLAY TERMINALS.

FOR MAJOR INCIDENT

NORMALLY THE COMPUTER SYSTEM WILL BE USED INVESTIGATIONS AND/OR MINOR CRIME INVESTIGATIONS BY THE ORGANISED AND SERIOUS CRIME BUREAU AND REGIONAL CRIME UNITS, THE

ENQUIRY CASUALTY IDENTIFICATION UNIT (DVIU).

UNIT (CEU)

AND

AND FOR TRAINING BY THE DISASTER VICTIM

ΤΟ NEED,

WILL BE THE

TO

IN THE EVENT OF A MAJOR DISASTER, THE COMPUTER SYSTEM

ACCORDING REDEPLOYED TO THE CEU/DVIU FUNCTIONS EXTENT THAT THE TOTAL SYSTEM WILL BE GIVEN OVER IF NECESSARY.

BE

CARRY

A

ΤΟ

OUT USED A STATION INFORMATION

A FURTHER $4.1 MILLION, WHICH WILL PILOT STUDY ON THE FEASIBILITY OF INSTALLING COMMUNAL SYSTEM, WAS ALSO APPROVED BY THE FINANCE COMMITTEE.

LOCATIONS OF THE REVIEW SHOWED

AT PRESENT, DATA KEPT IN DIFFERENT PHYSICAL FORCE ARE PROCESSED AND MAINTAINED MANUALLY. A RECENT THAT SUCH ARRANGEMENTS WERE EXTREMELY TEDIOUS AND INEFFICIENT.

IF A

PROVED ΤΟ

BE COST-EFFECTIVE,

SYSTEM

THE ONE-YEAR PILOT SCHEME,

FORCE-WIDE COMMUNAL BE FURTHER DEVELOPED INTO CONTAINING INFORMATION AT STATIONAL, REGIONAL AND HEADQUARTERS LEVELS.

WILL

18

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.