7
SATURDAY, JANUARY 14, 1989
ΤΟ
DESIGN WILL HAVE AN OPEN-ENDED THE PROPOSED NEW SYSTEM
STORED AND FACILITATE SUBSEQUENT CHANGES TO THE TYPES OF INFORMATION
SYSTEM, THE WILL INTERFACE WITH A FULLY INTEGRATED CRIME INFORMATION
SYSTEM AND THE CRIMINAL ENHANCED
AND CENTROL COMPUTER INTELLIGENCE COMPUTER SYSTEM NOW UNDER DEVELOPMENT.
COMMAND
THE USER OF ADDITIONAL ADVANTAGES WILL BE AN AVAILABILITY TO
A WORKLOAD OF OF SUPPORTING
40,000 AND A CAPABILITY TRANSACTIONS A DAY WITH A PEAK LOAD OF 6,500 TRANSACTIONS AN HOUR.
99.5%
MILLION
FOR THE AND DISASTER
ANOTHER $5.4 THE
APPROVED COMMITTEE
INVESTIGATION THE MAJOR INCIDENT COMPUTERISATION OF SEPPORT SYSTEM WHICH IS CURRENTLY OPERATED ON A MANUAL BASIS.
OF EXPENDITURE
ABOUT $824,000 FOR THE
A NON-RECURRENT MEMBERS ALSO ENDORSED 35.5 MILLION AND AN ANNUAL RECURRENT EXPENDITURE OF PROJECT.
COMPUTER ON-LINE BE A STAND-ALONE THE PROPOSED SYSTEM WILL
MAJOR
AND INCIDENT INVESTIGATION SYSTEM WHICH CAN BE USED FOR BOTH
FOR ACCESS MAJOR DISASTER SUPPORT FUNCTIONS, TO BE LOCATED CENTRALLY BY USER UNITS THROUGH VISUAL DISPLAY TERMINALS.
FOR MAJOR INCIDENT
NORMALLY THE COMPUTER SYSTEM WILL BE USED INVESTIGATIONS AND/OR MINOR CRIME INVESTIGATIONS BY THE ORGANISED AND SERIOUS CRIME BUREAU AND REGIONAL CRIME UNITS, THE
ENQUIRY CASUALTY IDENTIFICATION UNIT (DVIU).
UNIT (CEU)
AND
AND FOR TRAINING BY THE DISASTER VICTIM
ΤΟ NEED,
WILL BE THE
TO
IN THE EVENT OF A MAJOR DISASTER, THE COMPUTER SYSTEM
ACCORDING REDEPLOYED TO THE CEU/DVIU FUNCTIONS EXTENT THAT THE TOTAL SYSTEM WILL BE GIVEN OVER IF NECESSARY.
BE
CARRY
A
ΤΟ
OUT USED A STATION INFORMATION
A FURTHER $4.1 MILLION, WHICH WILL PILOT STUDY ON THE FEASIBILITY OF INSTALLING COMMUNAL SYSTEM, WAS ALSO APPROVED BY THE FINANCE COMMITTEE.
LOCATIONS OF THE REVIEW SHOWED
AT PRESENT, DATA KEPT IN DIFFERENT PHYSICAL FORCE ARE PROCESSED AND MAINTAINED MANUALLY. A RECENT THAT SUCH ARRANGEMENTS WERE EXTREMELY TEDIOUS AND INEFFICIENT.
IF A
PROVED ΤΟ
BE COST-EFFECTIVE,
SYSTEM
THE ONE-YEAR PILOT SCHEME,
FORCE-WIDE COMMUNAL BE FURTHER DEVELOPED INTO CONTAINING INFORMATION AT STATIONAL, REGIONAL AND HEADQUARTERS LEVELS.
WILL
18