TUESDAY, JUNE 21, 1988
19
TEMPORARY URBAN CLEARWAYS IN CAUSEWAY BAY AND NORTH POINT
* *
TWO EXISTING DAILY URBAN CLEARWAYS (7 AM TO 7 PM) ROAD IN CAUSEWAY BAY WILL BE EXTENDED WESTWARDS FROM 10 AM (JUNE 24), THE TRANSPORT DEPARTMENT ANNOUNCED.
LOCATIONS:
*
ON
ON
LEIGHTON FRIDAY
THE EXTENDED URBAN CLEARWAYS WILL BE LOCATED AT
THE
FOLLOWING
THE
NORTHERN KERBSIDE
LANE OF
ROAD FROM LEIGHTON
ITS POINT ABOUT 70 METRES JUNCTION WITH CANAL ROAD EAST TO A EAST OF ITS JUNCTION WITH PERCIVAL STREET; AND
THE SOUTHERN KERBSIDE LANE OF LEIGHTON NOS. 12 AND 54.
ROAD DETWEEN HOUSE
ABOUT ONE MONTH FOR TRAM TRACK
THIS MEASURE WILL LAST FOR
RENEWAL WORKS.
POINT WILL ALSO
AT THE SAME TIME, TWO ROAD SECTIONS IN NORTH BF DESIGNATED AS 7 AM TO 7 PM DAILY URBAN CLEARWAYS FOR ROADWORKS.
KERBSIDE LANE OF NORTH VIEW STREET FROM ITS THE WESTERN
NORTH OF THAT JUNCTION WITH FORT STREET TO A POINT ABOUT SIX METRES
SOUTH OF ITS JUNCTION AND A 15-METRE STRETCH ALONG NORTH POINT ROAD
FOR FOUR WEEKS JUNCTION WITH JAVA ROAD WILL BE MADE URBAN CLEARWAYS AND TWO MONTHS RESPECTIVELY.
BE ALLOWED TO STOP
NO VEHICLES EXCEPT FRANCHISED BUSES WILL FOR PASSENGERS OR GOODS WITHIN THE RESTRICTED AREAS,
TEMPORARY TRAFFIC ARRANGEMENTS ON WATERLOO ROAD
OF
THE
THE TRANSPORT DEPARTMENT ANNOUNCED THAT IN CONNECTION WITH RECONSTRUCTION
FLYOVER, THE FOLLOWING MARGARET ROAD PRINCESS TRAFFIC ARRANGEMENTS WILL BE IMPLEMENTED ON WATERLOO ROAD FROM TO 6 AM THE FOLLOWING DAY ON THURSDAY (JUNE 23) AND FRIDAY (JUNE 24).
10 PM
BETWEEN THE STARTING AND ARGYLE STREET
ONE LANE ON WATERLOO ROAD SOUTHBOUND POINT OF PRINCESS MARGARET ROAD FLYOVER WILL BE CLOSED TO TRAFFIC,
ROAD SOUTHBOUND ONTO THE U-TURNING MOVEMENT FROM WATERLOO
WILL BE WATERLOO ROAD NORTHBOUND OUTSIDE KOWLOON HOSPITAL
ARE ADVISED TO TRAVEL VIA BANNED.
MARGARET ROAD, PRINCESS WATERLOO ROAD SOUTHBOUND,
SHEUNG HING STREET, PUI CHING ROAD AND WATERLOO ROAD NORTHBOUND.
AFFECTED MOTORISTS
/20
!
Page 20Page 21
No comments yet.
Private notes are available after approval.