TUESDAY, JUNE 21, 1988

19

TEMPORARY URBAN CLEARWAYS IN CAUSEWAY BAY AND NORTH POINT

* *

TWO EXISTING DAILY URBAN CLEARWAYS (7 AM TO 7 PM) ROAD IN CAUSEWAY BAY WILL BE EXTENDED WESTWARDS FROM 10 AM (JUNE 24), THE TRANSPORT DEPARTMENT ANNOUNCED.

LOCATIONS:

*

ON

ON

LEIGHTON FRIDAY

THE EXTENDED URBAN CLEARWAYS WILL BE LOCATED AT

THE

FOLLOWING

THE

NORTHERN KERBSIDE

LANE OF

ROAD FROM LEIGHTON

ITS POINT ABOUT 70 METRES JUNCTION WITH CANAL ROAD EAST TO A EAST OF ITS JUNCTION WITH PERCIVAL STREET; AND

THE SOUTHERN KERBSIDE LANE OF LEIGHTON NOS. 12 AND 54.

ROAD DETWEEN HOUSE

ABOUT ONE MONTH FOR TRAM TRACK

THIS MEASURE WILL LAST FOR

RENEWAL WORKS.

POINT WILL ALSO

AT THE SAME TIME, TWO ROAD SECTIONS IN NORTH BF DESIGNATED AS 7 AM TO 7 PM DAILY URBAN CLEARWAYS FOR ROADWORKS.

KERBSIDE LANE OF NORTH VIEW STREET FROM ITS THE WESTERN

NORTH OF THAT JUNCTION WITH FORT STREET TO A POINT ABOUT SIX METRES

SOUTH OF ITS JUNCTION AND A 15-METRE STRETCH ALONG NORTH POINT ROAD

FOR FOUR WEEKS JUNCTION WITH JAVA ROAD WILL BE MADE URBAN CLEARWAYS AND TWO MONTHS RESPECTIVELY.

BE ALLOWED TO STOP

NO VEHICLES EXCEPT FRANCHISED BUSES WILL FOR PASSENGERS OR GOODS WITHIN THE RESTRICTED AREAS,

TEMPORARY TRAFFIC ARRANGEMENTS ON WATERLOO ROAD

OF

THE

THE TRANSPORT DEPARTMENT ANNOUNCED THAT IN CONNECTION WITH RECONSTRUCTION

FLYOVER, THE FOLLOWING MARGARET ROAD PRINCESS TRAFFIC ARRANGEMENTS WILL BE IMPLEMENTED ON WATERLOO ROAD FROM TO 6 AM THE FOLLOWING DAY ON THURSDAY (JUNE 23) AND FRIDAY (JUNE 24).

10 PM

BETWEEN THE STARTING AND ARGYLE STREET

ONE LANE ON WATERLOO ROAD SOUTHBOUND POINT OF PRINCESS MARGARET ROAD FLYOVER WILL BE CLOSED TO TRAFFIC,

ROAD SOUTHBOUND ONTO THE U-TURNING MOVEMENT FROM WATERLOO

WILL BE WATERLOO ROAD NORTHBOUND OUTSIDE KOWLOON HOSPITAL

ARE ADVISED TO TRAVEL VIA BANNED.

MARGARET ROAD, PRINCESS WATERLOO ROAD SOUTHBOUND,

SHEUNG HING STREET, PUI CHING ROAD AND WATERLOO ROAD NORTHBOUND.

AFFECTED MOTORISTS

/20

!

Page 20Page 21

Share This Page