TUESDAY, MARCH 22, 1988
15
WATER CUT IN SHEUNG SHUI
FRESH WATER SUPPLY TO CERTAIN PREMISES IN SHEUNG SHUI WILL BE TURNED OFF FROM 8 PM ON FRIDAY (MARCH 25) TO 7 AM THE FOLLOWING FOR WATER MAINS WORK.
THE AREA AFFECTED IS ALONG CASTLE PEAK ROAD FROM SHEUNG ROUNDABOUT TO PAK SHEK AU AND ALONG FAN KAM ROAD FROM SHEUNG ROUNDABOUT TO TA SHEK WU, INCLUDING TSUNG PAK LONG TSUEN, YIN TSUEN, KAM TSIN TSUEN, HANG TAU TSUEN, KWU TUNG TSUEN, HEUNG TSUEN, CHAU TAU TSUEN, LOK MA CHAU, PAK SHEK AU, TSUEN, TONG KUNG LENG TSUEN, LIN TONG MEI TSUEN, TSIU KENG YING PUN TSUEN.
DAY
SHUI
SHUI
KONG
HO SHEUNG PING KONG TSUEN AND
TEMPORARY TRAFFIC ARRANGEMENTS IN WAN CHAI, CENTRAL
*
O'BRIEN ROAD THE WESTBOUND SECTION OF GLOUCESTER ROAD BETWEEN
WILL BE TEMPORARILY CLOSED TO AND FENWICK PIER STREET IN WAN CHAI
FRIDAY (MARCH 25) TO FACILITATE THE TRAFFIC FROM 1 AM TO 6 AM ON ERECTION OF TRAFFIC GANTRY SIGNS.
WESTBOUND GLOUCESTER ROAD
DURING THE ROAD CLOSURE, VEHICLES ON GLOUCESTER ROAD
TRAVEL VIA HEADING FOR CENTRAL WILL BE DIVERTED TO SERVICE ROAD, FENWICK STREET AND HENNESSY ROAD.
A POINT ABOUT 35 IN CENTRAL, KENNEDY ROAD WESTBOUND BETWEEN
LEADING FROM COTTON METRES EAST OF ITS JUNCTION WITH THE SLIP ROAD TREE DRIVE AND A POINT ABOUT 55 METRES WEST OF THE SAME JUNCTION WILL DAILY URBAN CLEARWAY BB DESIGNATED A 7 AM TO 10 AM AND 4 PM TO 7 PM FROM 10 AM ON SATURDAY (MARCH 26).
THE RESTRICTION WILL BE IN FORCE FOR ABOUT FIVE WEEKS.
NO VEHICLES, EXCEPT FRANCHISED BUSES, WILL BE ALLOWED WITHIN THE URBAN CLEARWAY FOR GOODS OR PASSENGERS.
то STOP
/16
No comments yet.
Private notes are available after approval.