TUESDAY, MARCH 22, 1988

15

WATER CUT IN SHEUNG SHUI

FRESH WATER SUPPLY TO CERTAIN PREMISES IN SHEUNG SHUI WILL BE TURNED OFF FROM 8 PM ON FRIDAY (MARCH 25) TO 7 AM THE FOLLOWING FOR WATER MAINS WORK.

THE AREA AFFECTED IS ALONG CASTLE PEAK ROAD FROM SHEUNG ROUNDABOUT TO PAK SHEK AU AND ALONG FAN KAM ROAD FROM SHEUNG ROUNDABOUT TO TA SHEK WU, INCLUDING TSUNG PAK LONG TSUEN, YIN TSUEN, KAM TSIN TSUEN, HANG TAU TSUEN, KWU TUNG TSUEN, HEUNG TSUEN, CHAU TAU TSUEN, LOK MA CHAU, PAK SHEK AU, TSUEN, TONG KUNG LENG TSUEN, LIN TONG MEI TSUEN, TSIU KENG YING PUN TSUEN.

DAY

SHUI

SHUI

KONG

HO SHEUNG PING KONG TSUEN AND

TEMPORARY TRAFFIC ARRANGEMENTS IN WAN CHAI, CENTRAL

*

O'BRIEN ROAD THE WESTBOUND SECTION OF GLOUCESTER ROAD BETWEEN

WILL BE TEMPORARILY CLOSED TO AND FENWICK PIER STREET IN WAN CHAI

FRIDAY (MARCH 25) TO FACILITATE THE TRAFFIC FROM 1 AM TO 6 AM ON ERECTION OF TRAFFIC GANTRY SIGNS.

WESTBOUND GLOUCESTER ROAD

DURING THE ROAD CLOSURE, VEHICLES ON GLOUCESTER ROAD

TRAVEL VIA HEADING FOR CENTRAL WILL BE DIVERTED TO SERVICE ROAD, FENWICK STREET AND HENNESSY ROAD.

A POINT ABOUT 35 IN CENTRAL, KENNEDY ROAD WESTBOUND BETWEEN

LEADING FROM COTTON METRES EAST OF ITS JUNCTION WITH THE SLIP ROAD TREE DRIVE AND A POINT ABOUT 55 METRES WEST OF THE SAME JUNCTION WILL DAILY URBAN CLEARWAY BB DESIGNATED A 7 AM TO 10 AM AND 4 PM TO 7 PM FROM 10 AM ON SATURDAY (MARCH 26).

THE RESTRICTION WILL BE IN FORCE FOR ABOUT FIVE WEEKS.

NO VEHICLES, EXCEPT FRANCHISED BUSES, WILL BE ALLOWED WITHIN THE URBAN CLEARWAY FOR GOODS OR PASSENGERS.

то STOP

/16

Share This Page