THE EXISTING
KUNG SAI
GOVERNMENT
MONDAY, MARCH 7, 1988
CLINIC
AND
SAT
KUNG
DISPENSARY WILL BE CLOSED DOWN WHEN THE NEW CLINIC BEGINS OPERATION.
NOTE TO EDITORS:
A CEREMONY WILL BE HELD AT 3.30 PM ON OFFICIAL OPENING OF THE MONA FONG CLINIC.
OFFICIATING
WILL BE
WEDNESDAY TO MARK THE
AND
THE DIRECTOR OF MEDICAL AND HEALTH SERVICES, DR K.L. THONG; SIR RUN RUN SHAW OF THE SHAW FOUNDATION; THE DIRECTOR OF SHAW BROTHERS (HK) LTD, MADAM MONA FONG.
YOU ARE INVITED TO COVER THE EVENT.
IT
UP MEDIA REPRESENTATIVES A GOVERNMENT VAN (AM4774) WILL PICK FROM OUTSIDE THE KOWLOON PUBLIC PIER, TSIM SHA TSUI, ON WEDNESDAY. WILL LEAVE FOR SAI KUNG AT 2.30 PM.
-
RECLAMATION WORK PROPOSED IN TUEN MUN, KWUN TONG
#
INTENDS TO RECLAIM
THE GOVERNMENT
ABOUT FIVE HECTARES OF FORESHORE AND SEABED IN TUEN MUN TO PROVIDE LAND FOR INDUSTRIAL USE.
IT ALSO INTENDS TO CONSTRUCT A NEW BREAKWATER IN KWUN CONNECTION WITH BUILDING OF THE KWUN TONG BYPASS, PHASE TWO.
IN TUEN MUN, RECLAMATION WILL BE CARRIED OUT AT AND SEABED NEAR LUNG MUN ROAD IN AREA 18.
TONG IN
THE FORESHORE
A RIVER WALL ABOUT RIVER BED AND RECLAMATION BEHIND
THE PROJECT INCLUDES THE CONSTRUCTION OF 370 METRES LONG, DREDGING OF THE THIS RIVER WALL.
WORK IS EXPECTED TO BEGIN IN THE MIDDLE OF THE ABOUT 18 MONTHS TO COMPLETE.
YEAR AND TAKE
IN KWUN TONG, WORK WILL BE CARRIED OUT WITHIN AN AREA OF 21.95 HECTARES OF FORESHORE AND SEABED AT THE EASTERN END OF THE TONG TYPHOON SHELTER,
ABOUT
KWUN
IT
EXTENSION
THE
WILL INCLUDE THE OF
CONSTRUCTION OF A
NEW DEMOLITION
BREAKWATER,
OF
THE
EXISTING OUTER BREAKWATER, EXISTING INNER BREAKWATER AND DREDGING.
/WORK IS
No comments yet.
Private notes are available after approval.