THE EXISTING

KUNG SAI

GOVERNMENT

MONDAY, MARCH 7, 1988

CLINIC

AND

SAT

KUNG

DISPENSARY WILL BE CLOSED DOWN WHEN THE NEW CLINIC BEGINS OPERATION.

NOTE TO EDITORS:

A CEREMONY WILL BE HELD AT 3.30 PM ON OFFICIAL OPENING OF THE MONA FONG CLINIC.

OFFICIATING

WILL BE

WEDNESDAY TO MARK THE

AND

THE DIRECTOR OF MEDICAL AND HEALTH SERVICES, DR K.L. THONG; SIR RUN RUN SHAW OF THE SHAW FOUNDATION; THE DIRECTOR OF SHAW BROTHERS (HK) LTD, MADAM MONA FONG.

YOU ARE INVITED TO COVER THE EVENT.

IT

UP MEDIA REPRESENTATIVES A GOVERNMENT VAN (AM4774) WILL PICK FROM OUTSIDE THE KOWLOON PUBLIC PIER, TSIM SHA TSUI, ON WEDNESDAY. WILL LEAVE FOR SAI KUNG AT 2.30 PM.

-

RECLAMATION WORK PROPOSED IN TUEN MUN, KWUN TONG

#

INTENDS TO RECLAIM

THE GOVERNMENT

ABOUT FIVE HECTARES OF FORESHORE AND SEABED IN TUEN MUN TO PROVIDE LAND FOR INDUSTRIAL USE.

IT ALSO INTENDS TO CONSTRUCT A NEW BREAKWATER IN KWUN CONNECTION WITH BUILDING OF THE KWUN TONG BYPASS, PHASE TWO.

IN TUEN MUN, RECLAMATION WILL BE CARRIED OUT AT AND SEABED NEAR LUNG MUN ROAD IN AREA 18.

TONG IN

THE FORESHORE

A RIVER WALL ABOUT RIVER BED AND RECLAMATION BEHIND

THE PROJECT INCLUDES THE CONSTRUCTION OF 370 METRES LONG, DREDGING OF THE THIS RIVER WALL.

WORK IS EXPECTED TO BEGIN IN THE MIDDLE OF THE ABOUT 18 MONTHS TO COMPLETE.

YEAR AND TAKE

IN KWUN TONG, WORK WILL BE CARRIED OUT WITHIN AN AREA OF 21.95 HECTARES OF FORESHORE AND SEABED AT THE EASTERN END OF THE TONG TYPHOON SHELTER,

ABOUT

KWUN

IT

EXTENSION

THE

WILL INCLUDE THE OF

CONSTRUCTION OF A

NEW DEMOLITION

BREAKWATER,

OF

THE

EXISTING OUTER BREAKWATER, EXISTING INNER BREAKWATER AND DREDGING.

/WORK IS

Share This Page