XN000022-1987-11-10 — Page 25

Daily Information Bulletin 新聞公報 All

24

TUESDAY, NOVEMBER 10, 1987

THE

EXISTING DRAINAGE AND

BR ALSO RIVER IN ON

SYSTEM WILL SEWAGE IMPROVED WHILE A FOOTBRIDGE WILL BE BUILT ACROSS MA WAT LOK TSUEN.

HUI WILL

PERIOD.

THE EXISTING MORNING WHOLESALE ACTIVITIES IN LUEN WO BE REPROVISIONED TEMPORARILY IN ON LOK TSUEN DURING THE WORKS

BUT A TEMPORARY THE ON-STREET PARKING SPACES WILL ALSO BE SUSPENDED CARPARK WILL BE BUILT TO MEET THE NEEDS OF RESIDENTS.

TENDERS SHOULD BE SUBMITTED BY NOON ON DECEMBER 4.

URBAN CLEARWA RESTRICTIONS LIFTED

*

A NUMBER OF URBAN CLEARWAY RESTRICTIONS IN FANLING SHUI WILL BE LIFTED FROM FRIDAY (NOVEMBER 13).

IN

EXISTING

URBAN

AND SHRUNG

CLEARWAY OF ROAD L100 WILL

24-HOUR DAILY THE FANLING, RESTRICTION ON THE CUL-DE-SAC IN THE EASTERN END BE LIFTED FROM 7 AM ON FRIDAY.

(I.B. 7 TO ON A 35-METRE SHEUNG SHUI,

FROM 8 AM ON THE SAME DAY, THE EXISTING PEAK-HOUR 10 AM AND 4 TO 7 PM) DAILY URBAN CLEARWAY RESTRICTION STRETCH OF THE SOUTHERN KERBSIDE LANE OF FU HING STREET, EAST OF ITS JUNCTION WITH SAN FAT STREET WILL BE LIFTED.

ZONE STREET WILL

AT THE SAME TIME, THE CURRENT PUBLIC LIGHT BUS RESTRICTED OPERATING ROUND THE CLOCK ON THE SAME SECTION OF FU HING ALSO BE CANCELLED.

THE MEASURE IN SHEUNG SHUI WILL BE IN

FORCE FOR

ABOUT EIGHT

DAYS.

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.