24
TUESDAY, NOVEMBER 10, 1987
THE
EXISTING DRAINAGE AND
BR ALSO RIVER IN ON
SYSTEM WILL SEWAGE IMPROVED WHILE A FOOTBRIDGE WILL BE BUILT ACROSS MA WAT LOK TSUEN.
HUI WILL
PERIOD.
THE EXISTING MORNING WHOLESALE ACTIVITIES IN LUEN WO BE REPROVISIONED TEMPORARILY IN ON LOK TSUEN DURING THE WORKS
BUT A TEMPORARY THE ON-STREET PARKING SPACES WILL ALSO BE SUSPENDED CARPARK WILL BE BUILT TO MEET THE NEEDS OF RESIDENTS.
TENDERS SHOULD BE SUBMITTED BY NOON ON DECEMBER 4.
URBAN CLEARWA RESTRICTIONS LIFTED
*
A NUMBER OF URBAN CLEARWAY RESTRICTIONS IN FANLING SHUI WILL BE LIFTED FROM FRIDAY (NOVEMBER 13).
IN
EXISTING
URBAN
AND SHRUNG
CLEARWAY OF ROAD L100 WILL
24-HOUR DAILY THE FANLING, RESTRICTION ON THE CUL-DE-SAC IN THE EASTERN END BE LIFTED FROM 7 AM ON FRIDAY.
(I.B. 7 TO ON A 35-METRE SHEUNG SHUI,
FROM 8 AM ON THE SAME DAY, THE EXISTING PEAK-HOUR 10 AM AND 4 TO 7 PM) DAILY URBAN CLEARWAY RESTRICTION STRETCH OF THE SOUTHERN KERBSIDE LANE OF FU HING STREET, EAST OF ITS JUNCTION WITH SAN FAT STREET WILL BE LIFTED.
ZONE STREET WILL
AT THE SAME TIME, THE CURRENT PUBLIC LIGHT BUS RESTRICTED OPERATING ROUND THE CLOCK ON THE SAME SECTION OF FU HING ALSO BE CANCELLED.
THE MEASURE IN SHEUNG SHUI WILL BE IN
FORCE FOR
ABOUT EIGHT
DAYS.