PART II.-STATISTICAL TABLES.
Table A.-Analysis of Operated Mileage.
Particulars Main Line Second Sidings Loops Thack Sidings Total Lines owned:- Miles Miles Miles Miles Kowloon to Lowu (Gauge 4'8½″). 21.76 2.11 10.82 34.69 Lines operated:- Lowu to Shum Chun .30 .08 .38 Total 22.06 2.19 10.82 35.07Table B.-Permanent Way Renewals.
Particulars Previous Year Current Year 1. Sleepers. Wood 4,114 5,196 pieces Concrete (new) Concrete (2nd hand) 579 "" Total 4,114 5,775 Percentage renewal 6.29 2. Ballast. 21" Granite 1,036 450 3. Rails. 85 lb. B.S.S. 36 ft., new 8.83% 85 lb. B.S.S. 36 ft., old 1,180 cubic yards 3 lengths- S-59-
becomes- S-59-
PART II.-STATISTICAL TABLES.
Table A.-Analysis of Operated Mileage.
Particulars Main Line Second Sidings Loops Thack Sidings Total Lines owned:- Miles Miles Miles Miles Kowloon to Lowu (Gauge 4'8½″). 21.76 2.11 10.82 34.69 Lines operated:- Lowu to Shum Chun .30 .08 .38 Total 22.06 2.19 10.82 35.07Table B.-Permanent Way Renewals.
Particulars Previous Year Current Year 1. Sleepers. Wood 4,114 5,196 pieces Concrete (new) Concrete (2nd hand) 579 "" Total 4,114 5,775 Percentage renewal 6.29 2. Ballast. 21" Granite 1,036 450 3. Rails. 85 lb. B.S.S. 36 ft., new 8.83% 85 lb. B.S.S. 36 ft., old 1,180 cubic yards 3 lengths- S-59-
- S-59-
PART II.-STATISTICAL TABLES.
Table A.-Analysis of Operated Mileage.
Second
Main
Particulars
Thack Sidings
Total
Line
Loops
Lines owned:-
Miles
Miles
Miles
Miles
Kowloon to Lowu (Gauge 4'81⁄2′′).
21.76
2.11
10.82
34.69
Lines operated:-
Lowu to Shum Chun
.30
.08
.38
Total
22.06
2.19
10.82
35.07
Table B.-Permanent Way Renewals.
Previous Year
Particulars
Current Year
1. Sleepers.
4,114
Wood
5,196 pieces
Concrete (new)
Concrete (2nd hand)
579 ""
4,114
Total
5,775
""
6.29
1,036
450
Percentage renewal
2. Ballast.
21" Granite
3. Rails.
85 lb. B.S.S. 36 ft., new
85 lb. B.S.S. 36 ft., old
8.83%
1,180 cubic yards
3 lengths