DRAINAGE.
9. In Hong Kong, new main sewers and storm water drains to a length of 5,361 feet and new open channels of varying sections to a length of 717 feet were laid. In addition, 188 feet of existing nullah was decked over and 142 feet of main storm water drain previously inverted was completed. In Kowloon, New Kowloon and New Territories, new main sewers and storm water drains to a length of 6,414 feet, and new open channels of varying sections to a length of 528 feet were laid. Nullah walling was constructed to proper height and parapet walling built for a length of 500 feet.
10. Anti-Malarial work was continued in Hong Kong by the letting of two new contracts, one for an area between the two reservoirs at Aberdeen, the other in the vicinity of Pokfulam between the Queen Mary Hospital and Sandy Bay. Although these contracts were not let until late in the year good progress was made on preliminary work and excavation, and at Aberdeen area 300 feet of main channel was constructed. A 3,000 gallon reservoir with a "De Villiers" automatic syphon sluice was erected near Mount Cameron Road, and minor channelling was laid near Inland Lot No. 2441, Victoria Road. In Kowloon, several short lengths of channelling were laid as requested by the Government Malariologist. In New Kowloon, working on training the stream-course west of New Kowloon Inland Lot No. 1969 at Ngau Shi Wan was commenced in November. A length of 150 feet of 36" diameter channel was completed. Filling to the amount of 1,200 cubic yards was also completed and an area of 300 super yards was turfed.
WATER WORKS.
11. On the maintenance side the following works carried out:-
12. In Hong Kong the following lengths of new mains were laid to improve distributions:- 120 feet of 15", 287 feet of 10", 1,105 feet of 6", 144 feet of 5", 2,271 feet of 4", 2,211 feet of 3", 904 feet of 2". 3,624 feet of subsidiary mains were laid in back lanes. The Stanley Water Supply Scheme was completed. Construction of a 50,000 gallon covered service reservoir for Repulse Bay commenced.
13. In Kowloon and New Kowloon the following lengths of mains were laid:- 1,367 feet of 12", 1,724 feet of 6" and 3,607 feet of subsidiary mains in back lanes.
14. In the New Territories mains were laid as follows: 5,907 feet of 4" at Tsun Wan, 780 feet of 3" at Taipo and 364 feet of subsidiary mains in back lanes.
39
DRAINAGE.
9. In Hong Kong, new main sewers and storm water drains to a length of 5,361 feet and new open channels of varying sections to a length of 717 feet were laid. In addition, 188 feet of existing nullah was decked over and 142 feet of main storm water drain previously inverted was completed. In Kowloon, New Kowloon and New Territories, new main sewers and storm water drains to a length of 6,414 feet, and new open channels of varying sections to a length of 528 feet were laid. Nullah walling was constructed to proper height and parapet walling built for a length of 500 feet.
10. Anti-Malarial work was continued in Hong Kong by the letting of two new contracts, one for an area between the two reservoirs at Aberdeen, the other in the vicinity of Pokfulam between the Queen Mary Hospital and Sandy Bay. Although these contracts were not let until late in the year good progress was made on preliminary work and excavation, and at Aberdeen area 300 feet of main channel was constructed. A 3,000 gallon reservoir with a "De Villiers" automatic syphon sluice was erected near Mount Cameron Road, and minor channelling was laid near Inland Lot No. 2441, Victoria Road. In Kowloon, several short lengths of channelling were laid as requested by the Government Malariologist. In New Kowloon, working on training the stream-course west of New Kowloon Inland Lot No. 1969 at Ngau Shi Wan was commenced in November. A length of 150 feet of 36" diameter channel was completed. Filling to the amount of 1,200 cubic yards was also completed and an area of 300 super yards was turfed.
WATER WORKS.
11. On the maintenance side the following works carried out:-
12. In Hong Kong the following lengths of new mains were laid to improve distributions:-120 feet of 15", 287 feet of 10", 1,105 feet of 6", 144 feet of 5", 2,271 feet of 4", 2,211 feet of 3", 904 feet of 2". 3,624 feet of subsidiary mains were laid in back lanes. The Stanley Water Supply Scheme was com- pleted. Construction of a 50,000 gallon covered service reser- voir for Repulse Bay commenced.
>
13. In Kowloon and New Kowloon the following lengths of mains were laid:-1,367 feet of 12", 1,724 feet of 6′′ and 3,607 feet of subsidiary mains in back lanes.
14. In the New Territories mains were laid as follows: 5,907 feet of 4" at Tsun Wan, 780 feet of 3" at Taipo and 364 feet of subsidiary mains in back lanes,