system, Port. Development Office alterations to roof skylights, Wanchai Sanitary Stables-alterations to form hawkers licence office, No. 407 The Peak-altered drainage system, No. 361 The Peak-new bath and W.C. suite, Homestead Site Flats- renewed wooden cills to windows in concrete, No. 157 The Peak- installed two new fireplaces and serving hatch.

Electrical improvements and additions were carried out in thirty-nine buildings.

Expenditure

$23,438.48

48. Roads and Bridges In City (Maintenance and Improvements): The surface of approximately seventy-one miles of roads was generally maintained in a satisfactory manner.

The following figures show the extent of the operations carried out at the Government Quarry, Tsat Tze Mui, during the year: A total quantity of 38,507 cubic yards of various grades of stones were passed through crushers, of which 16,765 cubic yards were made into tar macadam, 1,572 cubic yards into sand carpeting and 20,170 cubic yards were delivered to various works as the material came from crushers. 10,718 granolithic paving slabs were provided for use on footways; thirty-eight reinforced concrete standards for railings; seven garden seats, forty-one wooden notice boards and one rubber squeegee were made.

The following are particulars of the additional areas laid with improved surfacing during the year:-

Tarring and sanding Square Yards. 2,339 New and carpeting 5,020 2$\frac{1}{2}$" granolithic paving laid on footways 10,932 Expenditure $69,240.44

49. Roads and Bridges Outside City (Maintenance and Improvements):-The surfaces of approximately ninety miles of roads was generally maintained in a satisfactory manner.

The following are particulars of the additional areas laid with improved surfacing during the year:-

Tarring and Sanding Square Yards. 7,988 2$\frac{1}{2}$" granolithic paving laid on footways 2,736

Four green and two red traffic control lights were installed at the junction of Stubbs Road and Magazine Gap Road.

Expenditure

$60,542.92

Edit History

2026-05-09 23:40:27 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Q 10 system, Port. Development Office alterations to roof skylights, Wanchai Sanitary Stables-alterations to form hawkers licence office, No. 407 The Peak-altered drainage system, No. 361 The Peak-new bath and W.C. suite, Homestead Site Flats- renewed wooden cills to windows in concrete, No. 157 The Peak- installed two new fireplaces and serving hatch. Electrical improvements and additions were carried out in thirty-nine buildings. Expenditure $23,438.48 48. Roads and Bridges In City (Maintenance and Improvements): The surface of approximately seventy-one miles of roads was generally maintained in a satisfactory manner. The following figures show the extent of the operations carried out at the Government Quarry, Tsat Tze Mui, during the year: A total quantity of 38,507 cubic yards of various grades of stones were passed through crushers, of which 16,765 cubic yards were made into tar macadam, 1,572 cubic yards into sand carpeting and 20,170 cubic yards were delivered to various works as the material came from crushers. 10,718 granolithic paving slabs were provided for use on footways; thirty-eight reinforced concrete standards for railings; seven garden seats, forty-one wooden notice boards and one rubber squeegee were made. The following are particulars of the additional areas laid with improved surfacing during the year:- Tarring and sanding Square Yards. 2,339 New and carpeting 5,020 2$\frac{1}{2}$" granolithic paving laid on footways 10,932 Expenditure $69,240.44 49. Roads and Bridges Outside City (Maintenance and Improvements):-The surfaces of approximately ninety miles of roads was generally maintained in a satisfactory manner. The following are particulars of the additional areas laid with improved surfacing during the year:- Tarring and Sanding Square Yards. 7,988 2$\frac{1}{2}$" granolithic paving laid on footways 2,736 Four green and two red traffic control lights were installed at the junction of Stubbs Road and Magazine Gap Road. Expenditure $60,542.92
Baseline (Original)
Q 10 system, Port. Development Office alterations to roof skylights, Wanchai Sanitary Stables-alterations to form hawkers licence office, No. 407 The Peak-altered drainage system, No. 361 The Peak-new bath and W.C. suite, Homestead Site Flats- renewed wooden cills to windows in concrete, No. 157 The Peak- installed two new fireplaces and serving hatch. Electrical improvements and additions were carried out in thirty-nine buildings. Expenditure $23,438.48 48. Roads and Bridges In City (Maintenance and Improve- ments): The surface of approximately seventy-one iniles of roads was generally maintained in a satisfactory manner. The following figures show the extent of the operations carried out at the Government Quarry, Tsat Tze Mui, during the year: A total quantity of 38,507 cubic yards of various grades of stones were passed through crushers, of which 16,765 cubic yards were made into tar macadam, 1,572 cubic yards into sand carpeting and 20,170 cubic yards were delivered to various works as the material came from crushers. 10,718 granolithic paving slabs were provided for use on footways; thirty-eight reinforced concrete standards for railings; seven garden seats, forty-one wooden notice boards and one rubber squeegee were made. The following are particulars of the additional areas laid with improved surfacing during the year:- Tarring and sanding 21" granolithic paving laid on footways New and carpeting Expenditure Squard Yards. 2,339 5,020 10,932 $69,240.44 49. Roads and Bridges Outside City (Maintenance and Improvements):-The surfaces of approximately ninety miles. of roads was generally maintained in a satisfactory manner. The following are particulars of the additional areas laid with improved surfacing during the year:- Tarring and Sanding 21" granolithic paving laid on footways Square Yards. 7,988 2,736 Four green and two red traffic control lights were installed at the junction of Stubbs Road and Magazine Gap Road. Expenditure .$60,542.92
2026-05-09 23:40:27 · Baseline
View content

Q 10

system, Port. Development Office alterations to roof skylights, Wanchai Sanitary Stables-alterations to form hawkers licence office, No. 407 The Peak-altered drainage system, No. 361 The Peak-new bath and W.C. suite, Homestead Site Flats- renewed wooden cills to windows in concrete, No. 157 The Peak- installed two new fireplaces and serving hatch.

Electrical improvements and additions were carried out in thirty-nine buildings.

Expenditure

$23,438.48

48. Roads and Bridges In City (Maintenance and Improve- ments): The surface of approximately seventy-one iniles of roads was generally maintained in a satisfactory manner.

The following figures show the extent of the operations carried out at the Government Quarry, Tsat Tze Mui, during the year: A total quantity of 38,507 cubic yards of various grades of stones were passed through crushers, of which 16,765 cubic yards were made into tar macadam, 1,572 cubic yards into sand carpeting and 20,170 cubic yards were delivered to various works as the material came from crushers. 10,718 granolithic paving slabs were provided for use on footways; thirty-eight reinforced concrete standards for railings; seven garden seats, forty-one wooden notice boards and one rubber squeegee were made.

The following are particulars of the additional areas laid with improved surfacing during the year:-

Tarring and sanding

21" granolithic paving laid on footways

New and carpeting

Expenditure

Squard Yards.

2,339

5,020

10,932

$69,240.44

49. Roads and Bridges Outside City (Maintenance and Improvements):-The surfaces of approximately ninety miles. of roads was generally maintained in a satisfactory manner.

The following are particulars of the additional areas laid with improved surfacing during the year:-

Tarring and Sanding

21" granolithic paving laid on footways

Square Yards.

7,988

2,736

Four green and two red traffic control lights were installed at the junction of Stubbs Road and Magazine Gap Road.

Expenditure

.$60,542.92