The heavy rainstorms referred to in the preceding paragraph caused damage to the drainage channels and earth slips occurred at the site for dumping silt from the reservoir. Repairs were carried out and charged against Typhoon and Rainstorm Damages.

231. General:-With the termination of the contract for removing silt the whole of the works under the Aberdeen Valley Water Scheme were completed, the costs of the various items of which are as follows:

(a) Preliminary Works 12,395.11

(b) Upper Dam 608,193.79

(c) East Catchwater 158,632.21

(d) West Catchwater 225,502.53

(e) Bennetts Hill Catchwater 14,154.00

(f) Lower Dam Alterations,

(i) Reconstruction 126,983.46

(ii) Removal of Silt 68,448.56

(g) Pipe Line 460,509.16

(h) Pumping Stations

(i) Upper 23,043.76

(ii) Lower 20,558.91

(i) Filtration Plant 194,458.16

(j) Pokfulam Dam Alterations 9,992.75

(k) Access Roads Nil.

(l) Nullah Reconstruction 26,894.21

(m) Drainage Works 36,482.49

(n) Resumption and Salvage 465,954.72

(o) Administration 103,998.96

$2,555,702.78

The Annual Expenditure was:

1929 $ 596,188.32

1930 648,072.45

1931 624,722.35

1932 405,487.20

1933 225,155.38

1934 56,077.08

$2,555,702.78

Expenditure to 31st Dec., 1934....$2,555,702.78

Edit History

2026-05-09 20:01:02 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Q 60 The heavy rainstorms referred to in the preceding paragraph caused damage to the drainage channels and earth slips occurred at the site for dumping silt from the reservoir. Repairs were carried out and charged against Typhoon and Rainstorm Damages. 231. General:-With the termination of the contract for removing silt the whole of the works under the Aberdeen Valley Water Scheme were completed, the costs of the various items of which are as follows: (a) Preliminary Works 12,395.11 (b) Upper Dam 608,193.79 (c) East Catchwater 158,632.21 (d) West Catchwater 225,502.53 (e) Bennetts Hill Catchwater 14,154.00 (f) Lower Dam Alterations, (i) Reconstruction 126,983.46 (ii) Removal of Silt 68,448.56 (g) Pipe Line 460,509.16 (h) Pumping Stations (i) Upper 23,043.76 (ii) Lower 20,558.91 (i) Filtration Plant 194,458.16 (j) Pokfulam Dam Alterations 9,992.75 (k) Access Roads Nil. (l) Nullah Reconstruction 26,894.21 (m) Drainage Works 36,482.49 (n) Resumption and Salvage 465,954.72 (o) Administration 103,998.96 $2,555,702.78 The Annual Expenditure was: 1929 $ 596,188.32 1930 648,072.45 1931 624,722.35 1932 405,487.20 1933 225,155.38 1934 56,077.08 $2,555,702.78 Expenditure to 31st Dec., 1934....$2,555,702.78
Baseline (Original)
Q 60 The heavy rainstorms referred to in the preceeding para- graph caused damage to the drainage channels and earth slips occurred at the site for dumping silt from the reservoir. Re- pairs were carried out and charged against Typhoon and Rain- storm Damages. 231. General:-With the termination of the contract for removing silt the whole of the works under the Aberdeen Valley Water Scheme were completed, the costs of the various items of which are as follows: (a) Preliminary Works (b) Upper Damı 12,395.11 608,193.79 (c) East Catchwater 158,632.21 (d) West Catchwater 225,502.53 (e) Bennetts Hill Catchwater 14,154.00 (f) Lower Dam Alterations, (i) Reconstruction 126,983.46 (ii) Removal of Silt 68,448.56 (g) Pipe Line 460,509.16 (h) Pumping Stations (i) Upper (ii) Lower (i) Filtration Plant () Pokfulam Dam Alterations (k) Access Roads Nil. 23,043.76 20,558.91 194,458.16 9,992.75 (1) Nullah Reconstruction 26,894.21 (m) Drainage Works 36,482.49 (n) Resumption and Salvage 465,954.72 (0) Administration 103,998.96 $2,555,702.78 The Annual Expenditure was: 1929 $ 596,188.32 1930 648,072.45 1931 624,722.35 1932 405,487.20 1933 225,155.38 1934 56,077.08 $2,555,702.78 Expenditure $ 56,077.08 Expenditure to 31st Dec., 1934....$2,555,702,78
2026-05-09 20:01:02 · Baseline
View content

Q 60

The heavy rainstorms referred to in the preceeding para- graph caused damage to the drainage channels and earth slips occurred at the site for dumping silt from the reservoir. Re- pairs were carried out and charged against Typhoon and Rain- storm Damages.

231. General:-With the termination of the contract for removing silt the whole of the works under the Aberdeen Valley Water Scheme were completed, the costs of the various items of which are as follows:

(a) Preliminary Works (b) Upper Damı

12,395.11

608,193.79

(c) East Catchwater

158,632.21

(d) West Catchwater

225,502.53

(e) Bennetts Hill Catchwater

14,154.00

(f) Lower Dam Alterations,

(i) Reconstruction

126,983.46

(ii) Removal of Silt

68,448.56

(g) Pipe Line

460,509.16

(h) Pumping Stations

(i) Upper

(ii) Lower

(i) Filtration Plant

() Pokfulam Dam Alterations

(k) Access Roads

Nil.

23,043.76

20,558.91

194,458.16

9,992.75

(1) Nullah Reconstruction

26,894.21

(m) Drainage Works

36,482.49

(n) Resumption and Salvage

465,954.72

(0) Administration

103,998.96

$2,555,702.78

The Annual Expenditure was:

1929

$ 596,188.32

1930

648,072.45

1931

624,722.35

1932

405,487.20

1933

225,155.38

1934

56,077.08

$2,555,702.78

Expenditure

$

56,077.08

Expenditure to 31st Dec., 1934....$2,555,702,78