Q 60
The heavy rainstorms referred to in the preceding paragraph caused damage to the drainage channels and earth slips occurred at the site for dumping silt from the reservoir. Repairs were carried out and charged against Typhoon and Rainstorm Damages.
231. General:-With the termination of the contract for removing silt the whole of the works under the Aberdeen Valley Water Scheme were completed, the costs of the various items of which are as follows:
(a) Preliminary Works 12,395.11
(b) Upper Dam 608,193.79
(c) East Catchwater 158,632.21
(d) West Catchwater 225,502.53
(e) Bennetts Hill Catchwater 14,154.00
(f) Lower Dam Alterations,
(i) Reconstruction 126,983.46
(ii) Removal of Silt 68,448.56
(g) Pipe Line 460,509.16
(h) Pumping Stations
(i) Upper 23,043.76
(ii) Lower 20,558.91
(i) Filtration Plant 194,458.16
(j) Pokfulam Dam Alterations 9,992.75
(k) Access Roads Nil.
(l) Nullah Reconstruction 26,894.21
(m) Drainage Works 36,482.49
(n) Resumption and Salvage 465,954.72
(o) Administration 103,998.96
$2,555,702.78
The Annual Expenditure was:
1929 $ 596,188.32
1930 648,072.45
1931 624,722.35
1932 405,487.20
1933 225,155.38
1934 56,077.08
$2,555,702.78
Expenditure to 31st Dec., 1934....$2,555,702.78
Q 60
The heavy rainstorms referred to in the preceeding para- graph caused damage to the drainage channels and earth slips occurred at the site for dumping silt from the reservoir. Re- pairs were carried out and charged against Typhoon and Rain- storm Damages.
231. General:-With the termination of the contract for removing silt the whole of the works under the Aberdeen Valley Water Scheme were completed, the costs of the various items of which are as follows:
(a) Preliminary Works (b) Upper Damı
12,395.11
608,193.79
(c) East Catchwater
158,632.21
(d) West Catchwater
225,502.53
(e) Bennetts Hill Catchwater
14,154.00
(f) Lower Dam Alterations,
(i) Reconstruction
126,983.46
(ii) Removal of Silt
68,448.56
(g) Pipe Line
460,509.16
(h) Pumping Stations
(i) Upper
(ii) Lower
(i) Filtration Plant
() Pokfulam Dam Alterations
(k) Access Roads
Nil.
23,043.76
20,558.91
194,458.16
9,992.75
(1) Nullah Reconstruction
26,894.21
(m) Drainage Works
36,482.49
(n) Resumption and Salvage
465,954.72
(0) Administration
103,998.96
$2,555,702.78
The Annual Expenditure was:
1929
$ 596,188.32
1930
648,072.45
1931
624,722.35
1932
405,487.20
1933
225,155.38
1934
56,077.08
$2,555,702.78
Expenditure
$
56,077.08
Expenditure to 31st Dec., 1934....$2,555,702,78