1,286 feet of 10", 1,135 feet of 8", 6,278 feet of 6", and 1,460 feet of 4". In addition 9,619 feet of subsidiary mains of from 14"-4" diameter were laid. The Yaumati Hill Service Reservoir was completed and brought into use. At Taipo 7,888 feet of 6" and 780 feet of 7" supply mains were laid. At Un Long the first section of a new water supply was nearly completed. The scheme includes intake works with rough filters and 11,600 gallons storage; 22,764 feet of 5" and 6" piping were laid and the irrigation dam was being reconstructed to provide a dry weather supply for cultivation.
11. The new five million gallons Service Reservoir at Yau-mati Hill was completed.
12. The Second Section of the West Catchwater and the removal of silt from the Lower Reservoir were completed and with the termination of these works the Aberdeen Valley Water Scheme was completed.
13. The Tytam Tuk East, Dragon's Back First Section, Pottinger Peak Second Section and Mount Parker First Section Catchwaters were completed and the Second Section of the Dragon's Back Catchwater was commenced.
14. Preparations were made for the laying of the Second Cross Harbour Pipe, and by the end of the year most of the materials had arrived in the Colony.
RECLAMATIONS.
15. At Tsat Tze Mui, a further seven and a half acres were reclaimed, this completes the reclamation of a section of about twenty-one and a half acres; work was commenced on a further instalment which will bring this reclamation to its seaward limit. The construction of about 700 feet of the sea wall to protect the reclamation at Kennedy Town was continued. The construction was completed of a length of about 2,700 feet of the rubble foundations for a sea wall to protect a reclamation of about forty acres at Kun Tong in Kowloon Bay.
ELECTRICAL WORKS.
16. Works completed were:- Telephone cables laid from No. 1 Police Station to Shaukiwan and between Kowloon-Canton Railway Station and Water Police Station; Automatic traffic signal and improved type of traffic control lights installed at Fedder Street and Magazine Gap Road; two police recall signals installed at Sha Tau Kok and Cheung Chau Police Station; Kowloon-Canton Railway Chinese Staff quarters A and B blocks rewired; one fifty-line telephone switch-board installed at Kow-loon Railway Station and an underground lighting cable laid
37
1,286 feet of 10", 1,135 feet of 8", 6,278 feet of 6", and 1,460 feet of 4". In addition 9,619 feet of subsidiary mains of from 14"-4" diameter were laid. The Yaumati Hill Service Reservoir was completed and brought into use. At Taipo 7,888 feet of 6′′ and 780 feet of 7" supply mains were laid. At Un Long the first section of a new water supply was nearly completed. The scheme includes intake works with rough filters and 11,600 gallons storage; 22,764 feet of 5′′ and 6" piping were laid and the irrigation dam was being reconstructed to provide a dry weather supply for cultivation.
11. The new five million gallons Service Reservoir at Yau- mati Hill was completed.
12. The Second Section of the West Catchwater and the removal of silt from the Lower Reservoir were completed and with the termination of these works the Aberdeen Valley Water Scheme was completed.
13. The Tytam Tuk East, Dragon's Back First Section, Pottinger Peak Second Section and Mount Parker First Section Catchwaters were completed and the Second Section of the Dragon's Back Catchwater was commenced.
14. Preparations were made for the laying of the Second Cross Harbour Pipe, and by the end of the year most of the materials had arrived in the Colony.
RECLAMATIONS.
15. At Tsat Tze Mui, a further seven and a half acres were reclaimed, this completes the reclamation of a section of about twenty-one and a half acres; work was commenced on a further instalment which will bring this reclamation to its seaward limit. The construction of about 700 feet of the sea wall to protect the reclamation at Kennedy Town was continued. The con- struction was completed of a length of about 2,700 feet of the rubble foundations for a sea wall to protect a reclamation of about forty acres at Kun Tong in Kowloon Bay.
ELECTRICAL WORKS.
16. Works completed were:-Telephone cables laid from No. 1 Police Station to Shaukiwan and between Kowloon-Canton Railway Station and Water Police Station; Automatic traffic signal and improved type of traffic control lights installed at Fedder Street and Magazine Gap Road; two police recall signals installed at Sha Tau Kok and Cheung Chau Police Station; Kowloon-Canton Railway Chinese Staff quarters A and B blocks rewired; one fifty-line telephone switch-board installed at Kow- loon Railway Station and an underground lighting cable laid