36
Station; main bridge at Sheung Shui was extended by the addition of one extra span; road leading to Lok Ma Chau Police Station was strengthened and improved; road to Kam Tin was widened; a length of the main road between Castle Peak and Un Long was tar-painted for a distance of two miles; car park on the Castle Peak Road between 10th and 13th miles; streets at Sha Tau Kok, Taipo Market and Un Long were surfaced, kerbed and channelled in front of new houses.
8. Works under construction were:- New 100 ft. Shaukiwan Road, 1st and 2nd Sections from Causeway Bay to Taikoo Sugar Refinery; new Road to Bathing Beaches (S.E. of Repulse Bay): Robinson Road widening between Peak Road and Gleneally; Blue Pool Road Improvements-1st section; 10 ft. Path from Shek O Gap to Cape D'Aguilar Wireless Station; new Road from Island Road to Stanley; Widening of Magazine Gap Road between May Road and Stubbs Road.
DRAINAGE.
9. New sewers and storm water drains were constructed in Hong Kong to a length of 11,997 feet, open nullahs to a length of 334 feet and parapet walling to open nullahs 933 feet. Anti-malarial Campaign work was completed at Lyeemun and continued at Mt. Parker and Sookunpoo. Streams were trained to a total length of 19,597 feet. In Kowloon, New Kowloon and New Territories, new sewers and storm water drains were constructed to a length of 14,641 feet; open nullahs full section 113 feet, part section 1,278 feet; parapet walling 232 feet; channelling 1,116 feet. Anti-malarial work at Kowloon Tong:- Nullahs and channels were constructed to a length of 2,642 feet, and "cutting and filling" amounting to 6,928 cubic yards was carried out.
WATER WORKS.
10. In Hong Kong the following lengths of new mains were laid to improve the distribution system:- 432 feet of 12", 2,326 feet of 10", 566 feet of 8", 3,910 feet of 6", and 13,574 feet of smaller sizes. 274 feet of 2" subsidiary main were laid in back lanes. The Jardine's Lookout Section of the Eastern Pumping Scheme was practically completed by the end of the year. The scheme includes two turbine driven ram pumps each capable of delivering 3,600 gallons per hour from Eastern Filter Beds to a service reservoir at 778 A.O.D. through a 5" diameter rising main 2,687 feet in length. 4,680 feet of 3" and 4" diameter distribution mains were laid and a 45,000 gallons balance reservoir above Tai Hang at 533 A.O.D. was nearly completed. A scheme for a similar installation to service the Middle Gap and Mount Cameron Districts was investigated. A scheme to improve the water supply to the Stanley District was investigated and reported on. In Kowloon and New Kowloon the following lengths of new mains were laid:- 300 feet of 18", 6,295 feet of 12",
36
Station; main bridge at Sheung Shui was extended by the addi- tion of one extra span; road leading to Lok Ma Chau Police. Station was strengthened and improved; road to Kam Tin was widened; a length of the main road between Castle Peak and Un Long was tar-painted for a distance of two miles; car park on the Castle Peak Road between 10th and 13th miles; streets at Sha Tau Kok, Taipo Market and Un Long were surfaced, kerbed and channelled in front of new houses.
8. Works under construction were:-New 100 ft. Shaukiwan Road, 1st and 2nd Sections from Causeway Bay to Taikoo Sugar Refinery; new Road to Bathing Beaches (S.E. of Repulse Bay): Robinson Road widening between Peak Road and Gleneally; Blue Pool Road Improvements-1st section; 10 ft. Path from Shek O Gap to Cape D'Aguilar Wireless Station; new Road from Island Road to Stanley; Widening of Magazine Gap Road between May Road and Stubbs Road.
DRAINAGE.
9. New sewers and storm water drains were constructed in Hong Kong to a length of 11,997 feet, open nullahs to a length of 334 feet and parapet walling to open nullahs 933 feet. Anti-malarial Campaign work was completed at Lyeemun and continued at Mt. Parker and Sookunpoo. Streams were trained to a total length of 19,597 feet. In Kowloon, New Kowloon and New Territories, new sewers and storm water drains were con- structed to a length of 14,641 feet; open nullahs full section 113 feet, part section 1,278 feet; parapet walling 232 feet; channelling 1,116 feet. Anti-malarial work at Kowloon Tong:-Nullahs and channels were constructed to a length of 2,642 feet, and "cutting and filling" amounting to 6,928 cubic yards was carried out.
}
WATER WORKS.
10. In Hong Kong the following lengths of new mains were iaid to improve the distribution system:-432 feet of 12", 2,326 feet of 10", 566 feet of 8", 3,910 feet of 6", and 13,574 feet of smaller sizes. 274 feet of 2" subsidiary main were laid in back lanes. The Jardine's Lookout Section of the Eastern Pumping Scheme was practically completed by the end of the year. The scheme includes two turbine driven ram pumps each capable of delivering 3,600 gallons per hour from Eastern Filter Beds to a service reservoir at 778 A.O.D. through a 5" diameter rising main 2,687 feet in length. 4,680 feet of 3" and 4" diameter distribution mains were laid and a 45,000 gallons balance reservoir above Tai Hang at 533 A.O.D. was nearly completed. A scheme for a similar installation to service the Middle Gap and Mount Cameron Districts was investigated. A scheme to improve the water supply to the Stanley District was investigated and re- ported on. In Kowloon and New Kowloon the following lengths of new mains were laid:-300 feet of 18", 6,295 feet of 12",
•