AnnualReport-1929 — Page 629

Administrative Reports 行政報告書 All AI Reviewed

Q 142

From Au Tau Minor Triangulation Station to Ping Shan Triangulation Station. Length 24 miles. Closing error in 19,000.

From Lamti Triangulation Station to Castle Peak Triangulation Station. Length 3 miles. Closing error 1 in 9,200.

(b) The following were the most important surveys carried out during the year:-

Area Chainage acres. in miles. The survey of the race course at Kwanti was completed and plotted.. 100 A survey at Ku Tung near Sheung Shui for the proposed new layout scheme 41 Survey at Castle Peak and revision of areas under dispute and demarca-tion of boundaries 50 21 Survey at Fanling 130 21/ A survey at Tai Po Market 12 ** Tai Po 19 3.2 Sheung Shui 23 Survey of Lots Nos. 730, 755, 756, 757, D.D.31 Castle Peak 21/ 34

Several Centre Lines of proposed new roads and an area of about 4 acres for proposed building lots at Un Loong was set out.

Also numerous minor surveys for District Officer, North; setting out lots and defining boundaries and fixing boundary stones.

8. General:-

(1) The number of plans (in quad.) for attachment to leases and title deeds, necessitating separate surveys being made, was 771 during the year 1929.

(2) With reference to paragraph 3 in the 1928 report- it is now understood that the 1:800 and the 1:30,800 maps mentioned therein will not be published but that instead it has been decided to publish a 1:1300 covering Kowloon and Victoria and ... to cover the same area as the 1:100,000

Edit History

2026-05-09 03:50:16 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Q 142 From Au Tau Minor Triangulation Station to Ping Shan Triangulation Station. Length 24 miles. Closing error in 19,000. From Lamti Triangulation Station to Castle Peak Triangulation Station. Length 3 miles. Closing error 1 in 9,200. (b) The following were the most important surveys carried out during the year:- Area Chainage acres. in miles. The survey of the race course at Kwanti was completed and plotted.. 100 A survey at Ku Tung near Sheung Shui for the proposed new layout scheme 41 Survey at Castle Peak and revision of areas under dispute and demarca-tion of boundaries 50 21 Survey at Fanling 130 21/ A survey at Tai Po Market 12 ** Tai Po 19 3.2 Sheung Shui 23 Survey of Lots Nos. 730, 755, 756, 757, D.D.31 Castle Peak 21/ 34 Several Centre Lines of proposed new roads and an area of about 4 acres for proposed building lots at Un Loong was set out. Also numerous minor surveys for District Officer, North; setting out lots and defining boundaries and fixing boundary stones. 8. General:- (1) The number of plans (in quad.) for attachment to leases and title deeds, necessitating separate surveys being made, was 771 during the year 1929. (2) With reference to paragraph 3 in the 1928 report- it is now understood that the 1:800 and the 1:30,800 maps mentioned therein will not be published but that instead it has been decided to publish a 1:1300 covering Kowloon and Victoria and ... to cover the same area as the 1:100,000
Baseline (Original)
Q 142 From Au Tau Minor Triangulation Station to Ping Shan Triangulation Station. Length 24 miles. Closing error in 19,000. From Lamti Triangulation Station to Castle Peak Triangu lation Station. Length 3 miles. Closing error 1 in 9,200. (b) The following were the most important surveys carried out during the year:- Area Chainage acres. The survey of the race course at Kwanti was completed and plotted.. 100 A survey at Ku Tung near Sheung Shui for the proposed new layout scheme Survey at Castle Peak and revision of in miles. 41 61 areas under dispute and demarca- tion of boundaries 50 21 Survey at Fanling 130 21/ A survey at Tai Po Market 12 ** Tai Po 19 3.2 Sheung Shui 23 Survey of Lots Nos. 730, 755, 756, 757, D.D.31 Castle Peak 21/ 34 Several Centre Lines of proposed new roads and an area of about 4 acres for proposed building lots at Un Loong was set out. · Also numerous minor surveys for District Officer, North; setting out lots and defining boundaries and fixing boundary stones. 8. General:- (1) The number of plans (in quad.) for attachment to leases and title deeds, necessitating separate surveys being made, was 771 during the year 1929. (2) With reference to paragraph 3 in the 1928 report- it is now understood that the soo and the 30,800 maps mentioned therein will not be published but that instead it has been decided to publish a 1300 covering Kowloon and Victoria and ટો to cover the same area as the bo πόσο 100.000
2026-05-09 03:50:16 · Baseline
View content

Q 142

From Au Tau Minor Triangulation Station to Ping Shan Triangulation Station. Length 24 miles. Closing error in 19,000.

From Lamti Triangulation Station to Castle Peak Triangu lation Station. Length 3 miles. Closing error 1 in 9,200.

(b) The following were the most important surveys carried out during the year:-

Area Chainage

acres.

The survey of the race course at

Kwanti was completed and plotted.. 100

A survey at Ku Tung near Sheung Shui for the proposed new layout

scheme

Survey at Castle Peak and revision of

in miles.

41

61

areas under dispute and demarca- tion of boundaries

50

21

Survey at Fanling

130

21/

A survey at Tai Po Market

12

**

Tai Po

19

3.2

Sheung Shui

23

Survey of Lots Nos. 730, 755, 756,

757, D.D.31 Castle Peak

21/

34

Several Centre Lines of proposed new roads and an area of about 4 acres for proposed building lots at Un Loong was set

out.

· Also numerous minor surveys for District Officer, North; setting out lots and defining boundaries and fixing boundary

stones.

8. General:-

(1) The number of plans (in quad.) for attachment to leases and title deeds, necessitating separate surveys being made, was 771 during the year 1929.

(2) With reference to paragraph 3 in the 1928 report- it is now understood that the soo and the 30,800 maps mentioned therein will not be published but that instead it has been decided to publish a 1300 covering Kowloon and Victoria and ટો to cover the same area as the bo

πόσο 100.000

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note