AnnualReport-1929 — Page 616

Administrative Reports 行政報告書 All AI Reviewed

129

ANNEXE B,-Continued.

HEADS AND SUB-HEADS.

ESTIMATED.

Brought forward.............. 2,931,605

New Kowloon,—Continued.

Miscellaneous.

PROVISION-

ACTUAL. INCREASE. DECREASE. ALLY BALANCE. EXCESS. VOTED. $ $ 1,570,345.14 332,281.86 C. $ 1,693,511.72 414,874.00 C. 1,776,133.86 C.

125. Kowloon City, Filling in of large areas,

30,000 30,000.00 30,000.00

126. Repairs to Kowloon City wall,

127. Cheung Sha Wan, Forming site for Exchanges,

2,000 1,980.19 19.81 :: 19.81 4,500 4,500.00 4,500.00

128. Filling in areas North West of Nan Cheong Street and West of Tai Po Road,

30,000 74.00 29,926.00 29,926.00

Waterworks.

129. Kowloon Tong Estate Mains,

5,000

130. Distributing Water Mains,

10,000 3,663.32 9,629.48 ...... 1,336.68 370.52 1,336.68 370.52

131. Filtered water supply to Dairy Farm Lots at Diamond Hill,

20,000 9,394.27 10,605.73 10,605.73

Port Works.

132. Further Reclamation at Sham Shui Po,

133. Cheung Sha Wan, Construction of mound to retain materials dumped,

134. Lai Chi Kok, Water Boat Dock, surfacing to East wall,

60,000 53,817.21 6,182.79 6,182.79 50,000 27,895.98 22,104.02 22,104.02 2,400 1,549.57 850.43 850.43

Public Health and Buildings Ordinance.

135. Compensation and Resumptions,

100,000 34,951.77 65,048.23 65,048.23

New Territories.

Buildings.

136. Cheung Chau, Anglo Chinese School,

10,000 5,794.47 4,205.53 De a 4,205.53

General Works.

137. Roads

2,500 2,309.83 190.17 : 190.17

Drainage.

138. Training Nullahs,

1,500 1,355.62

139. Miscellaneous Drainage Works,

5,000 3,249.41

140. Miscellaneous,

7,500 6,378.90 144.38 1,750.59 1,121.10 144.38

141. Waterworks,

1,000 783.02 *** 2,200.00 3,321.10 *** 216.98 1,750.59

Communications.

142. Patrol Path from Lin Ma Hang to Sha Tau Kok,.......................

50,000 9,943.60 27,660.97 40,056.40 40,056.40

149. Reconditioning Roads,

30,000 2,339.03 2,339.03

144. Widening Patrol Path, Sheung Shui to Ta Ku Ling to 10 ft, (Bridge $2,500),

8,500 5,082.35 3,417.65 3,417.65

145. Access and Patrol Path to Lo Wu Railway Station Block House...........

4,500 2,477.53 2,022.47 2,022.47

146. Widening existing road between Fanling and Sha Tau Kok upon removal of Railway,

10,000 7,078.84 2,921.16 2,921.16

147. Tai Po Road Improvement, Bridge at 13 miles,

30,000 30,000.00 *** 30,000.00 :

Miscellaneous-

148. Levelling strip of land now occupied by the Railway, Sha Tau Kok.................

149. Forming and surfacing street in front of D. D. C. Lot 827 C, and D. and 828 C,

5,000 1,195.18 3,804.82 -- 3,804.82 2,000

150. Magnetic Huts, Au Tau, fencing,

Public Health and Buildings Ordinance.

151. Compensation and Resumptions,

1,600 1,432.88 988.95 567.12 611.05 5,000 2,223.10 2,776.90 3,804.82 567.12 611.05 2,776.90

Carried forward

3,419,605 1,791,255.58 332,281.86 1,960,631.28 417,074.00 2,045,423.42

Edit History

2026-05-09 03:46:24 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
129 ANNEXE B,-Continued. HEADS AND SUB-HEADS. ESTIMATED. Brought forward.............. 2,931,605 New Kowloon,—Continued. Miscellaneous. PROVISION- ACTUAL. INCREASE. DECREASE. ALLY BALANCE. EXCESS. VOTED. $ $ 1,570,345.14 332,281.86 C. $ 1,693,511.72 414,874.00 C. 1,776,133.86 C. 125. Kowloon City, Filling in of large areas, 30,000 30,000.00 30,000.00 126. Repairs to Kowloon City wall, 127. Cheung Sha Wan, Forming site for Exchanges, 2,000 1,980.19 19.81 :: 19.81 4,500 4,500.00 4,500.00 128. Filling in areas North West of Nan Cheong Street and West of Tai Po Road, 30,000 74.00 29,926.00 29,926.00 Waterworks. 129. Kowloon Tong Estate Mains, 5,000 130. Distributing Water Mains, 10,000 3,663.32 9,629.48 ...... 1,336.68 370.52 1,336.68 370.52 131. Filtered water supply to Dairy Farm Lots at Diamond Hill, 20,000 9,394.27 10,605.73 10,605.73 Port Works. 132. Further Reclamation at Sham Shui Po, 133. Cheung Sha Wan, Construction of mound to retain materials dumped, 134. Lai Chi Kok, Water Boat Dock, surfacing to East wall, 60,000 53,817.21 6,182.79 6,182.79 50,000 27,895.98 22,104.02 22,104.02 2,400 1,549.57 850.43 850.43 Public Health and Buildings Ordinance. 135. Compensation and Resumptions, 100,000 34,951.77 65,048.23 65,048.23 New Territories. Buildings. 136. Cheung Chau, Anglo Chinese School, 10,000 5,794.47 4,205.53 De a 4,205.53 General Works. 137. Roads 2,500 2,309.83 190.17 : 190.17 Drainage. 138. Training Nullahs, 1,500 1,355.62 139. Miscellaneous Drainage Works, 5,000 3,249.41 140. Miscellaneous, 7,500 6,378.90 144.38 1,750.59 1,121.10 144.38 141. Waterworks, 1,000 783.02 *** 2,200.00 3,321.10 *** 216.98 1,750.59 Communications. 142. Patrol Path from Lin Ma Hang to Sha Tau Kok,....................... 50,000 9,943.60 27,660.97 40,056.40 40,056.40 149. Reconditioning Roads, 30,000 2,339.03 2,339.03 144. Widening Patrol Path, Sheung Shui to Ta Ku Ling to 10 ft, (Bridge $2,500), 8,500 5,082.35 3,417.65 3,417.65 145. Access and Patrol Path to Lo Wu Railway Station Block House........... 4,500 2,477.53 2,022.47 2,022.47 146. Widening existing road between Fanling and Sha Tau Kok upon removal of Railway, 10,000 7,078.84 2,921.16 2,921.16 147. Tai Po Road Improvement, Bridge at 13 miles, 30,000 30,000.00 *** 30,000.00 : Miscellaneous- 148. Levelling strip of land now occupied by the Railway, Sha Tau Kok................. 149. Forming and surfacing street in front of D. D. C. Lot 827 C, and D. and 828 C, 5,000 1,195.18 3,804.82 -- 3,804.82 2,000 150. Magnetic Huts, Au Tau, fencing, Public Health and Buildings Ordinance. 151. Compensation and Resumptions, 1,600 1,432.88 988.95 567.12 611.05 5,000 2,223.10 2,776.90 3,804.82 567.12 611.05 2,776.90 Carried forward 3,419,605 1,791,255.58 332,281.86 1,960,631.28 417,074.00 2,045,423.42
Baseline (Original)
129 ANNEXE B,-Continued. HEADS AND SUB-HEADS. ESTIMATED. Brought forward.............. 2,931,605 New Kowloɔa,—Continued. Miscel a -eous. PROVISION- ACTUAL. INCREASE. DECREASE. ALLY BALANCE. EXCESS. VOTED. $ 0. 1,570,345.14 332,281.86 $ C. $ 1,693.511.72 414,874.00 $ C. 1 776,133.86 $ C. 125. Kowloon City, Filling in of large areas, 30,000 Pa 30,000.00 126. Repairs to Kowloon City wall, 127. Cheung Sha Wan, Forming site for Exchanges, 2,000 1,980,19 19.81 :: 30,000.00 19.81 4,500 4,500.00 4,500.00 128. Filling in areas North West of Nan Cheong Street and West of Taipo Road, 30,000 74.00 29,926 00 29,926.00 Waterworks. 129. Kowloon Tong Estate Mains, 5,000 130. Distributing Water Mains, 10,000 3,663.32 9,629.48 ...... 1,336.68 370,52 1,336.68 370.52 131. Filtered water supply to Dairy Farm Lots at Diamond Hill, 20,000 9,394.27 10,605.73 10,605,73 Port Works. 132. Further Reclamation at Shamsbuipo, 133. Cheung Sha Wan, Construction of mound to retain materials dumped, 134. Lai Chi Kok, Water Boat Dock, sur- facing to East wall, 60,000 53,817.21 6,182.79 6,182.79 50,000 27,895.98 22,104.02 22,104.02 2,400 1,549.57 850.43 850.43 Public Health and Buildings Ordinance. 135. Compensation and Resumptions, 100,000 34,951,77 65,048.23 65,048.23 New Territories. Buildings. 136. Cheung Chau, Anglo Chinese School, 10,000 5,794.47 De a 4.205.53 4,205.53 General Works. 137. Roads 2,500 2,309.83 190.17 : 190.17 Drainage. 138. Training Nallabs, 1,500 1,355.62 139. Miscellaneous Drainage Works, 5,000 3,249.41 140. Miscellaneous, 7,500 6,378.90 144 38 1,750.59 1,121.10 144.38 141. Waterworks, 1,000 783.02 *** 2,200.00 3,321.10 *** 216.98 216.98 1,750.59 Communications. 142. Patrol Path from Lin Ma Hang to Sha Tau Kok,....................... 50,000 149. Reconditioning Roads, 30,000 9,943.60 27,660.97 40,056.40 40,056.40 2,339.03 2,339.03 144. Widening Patrol Path, Sheung Shui to Ta Ku Ling to 10 ft, (Bridge $2,500), 8,500 5,082.35 3,417.65 3,417.65 145. Access and Patrol Path to Lo Wu Railway Station Block House........... 4,500 2,477.53 2,022.47 2,022.47 146. Widening existing road between Fanling and Sha Tau Kok upon removal of Railway, 10,000 7,078.84 2,921.16 2,921.16 147. Tai Po Road Improvement, Bridge at 13 miles, 30,000 30,000.00 *** 30,000,00 : Miscellaneous- 148. Levelling strip of land now occupied by the Railway, Sha Tau Kok................. 149. Forming and surfacing street in front of D. D. C. Lot 827 C, and D. and 828 C, 5,000 1,195.18 -- 3,804,82 2,000 150. Magentic Huts, Au Tau, fencing, Public Health and Buildings Ordinance. 151. Compensation and Resumptions, Carried forward 1,600 1,432,88 988.95 567.12 611.05 5,000 2,223.10 2,776.90 3,804.82 567.12 611.05 2,776.90 3,419,605 1,791,255.58 332,281.86 1.960.631.28 417,074.00 2,045,423 42
2026-05-09 03:46:24 · Baseline
View content

129

ANNEXE B,-Continued.

HEADS AND SUB-HEADS.

ESTIMATED.

Brought forward..............

2,931,605

New Kowloɔa,—Continued.

Miscel a -eous.

PROVISION-

ACTUAL. INCREASE. DECREASE. ALLY BALANCE. EXCESS.

VOTED.

$

0.

1,570,345.14 332,281.86

$

C. $ 1,693.511.72 414,874.00

$

C.

1 776,133.86

$

C.

125. Kowloon City, Filling in of large

areas,

30,000

Pa

30,000.00

126. Repairs to Kowloon City wall, 127. Cheung Sha Wan, Forming site for

Exchanges,

2,000

1,980,19

19.81

::

30,000.00 19.81

4,500

4,500.00

4,500.00

128. Filling in areas North West of Nan Cheong Street and West of Taipo Road,

30,000

74.00

29,926 00

29,926.00

Waterworks.

129. Kowloon Tong Estate Mains,

5,000

130. Distributing Water Mains,

10,000

3,663.32 9,629.48

......

1,336.68 370,52

1,336.68

370.52

131. Filtered water supply to Dairy Farm

Lots at Diamond Hill,

20,000

9,394.27

10,605.73

10,605,73

Port Works.

132. Further Reclamation at Shamsbuipo, 133. Cheung Sha Wan, Construction of

mound to retain materials dumped, 134. Lai Chi Kok, Water Boat Dock, sur-

facing to East wall,

60,000

53,817.21

6,182.79

6,182.79

50,000

27,895.98

22,104.02

22,104.02

2,400

1,549.57

850.43

850.43

Public Health and Buildings Ordinance.

135. Compensation and Resumptions,

100,000

34,951,77

65,048.23

65,048.23

New Territories.

Buildings.

136. Cheung Chau, Anglo Chinese School,

10,000

5,794.47

De a

4.205.53

4,205.53

General Works.

137. Roads

2,500

2,309.83

190.17

:

190.17

Drainage.

138. Training Nallabs,

1,500

1,355.62

139. Miscellaneous Drainage Works,

5,000

3,249.41

140. Miscellaneous,

7,500

6,378.90

144 38 1,750.59 1,121.10

144.38

141. Waterworks,

1,000

783.02

***

2,200.00

3,321.10

***

216.98

216.98

1,750.59

Communications.

142. Patrol Path from Lin Ma Hang to

Sha Tau Kok,.......................

50,000

149. Reconditioning Roads,

30,000

9,943.60 27,660.97

40,056.40

40,056.40

2,339.03

2,339.03

144. Widening Patrol Path, Sheung Shui

to Ta Ku Ling to 10 ft, (Bridge $2,500),

8,500

5,082.35

3,417.65

3,417.65

145. Access and Patrol Path to Lo Wu

Railway Station Block House...........

4,500

2,477.53

2,022.47

2,022.47

146. Widening existing road between Fanling and Sha Tau Kok upon removal of Railway,

10,000

7,078.84

2,921.16

2,921.16

147. Tai Po Road Improvement, Bridge

at 13 miles,

30,000

30,000.00

***

30,000,00

:

Miscellaneous-

148. Levelling strip of land now occupied

by the Railway, Sha Tau Kok................. 149. Forming and surfacing street in front of D. D. C. Lot 827 C, and D. and 828 C,

5,000

1,195.18

--

3,804,82

2,000

150. Magentic Huts, Au Tau, fencing, Public Health and Buildings Ordinance. 151. Compensation and Resumptions,

Carried forward

1,600

1,432,88 988.95

567.12 611.05

5,000

2,223.10

2,776.90

3,804.82

567.12

611.05

2,776.90

3,419,605 1,791,255.58

332,281.86 1.960.631.28 417,074.00 2,045,423 42

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.