129
ANNEXE B,-Continued.
HEADS AND SUB-HEADS.
ESTIMATED.
Brought forward.............. 2,931,605
New Kowloon,—Continued.
Miscellaneous.
PROVISION-
ACTUAL. INCREASE. DECREASE. ALLY BALANCE. EXCESS. VOTED. $ $ 1,570,345.14 332,281.86 C. $ 1,693,511.72 414,874.00 C. 1,776,133.86 C.125. Kowloon City, Filling in of large areas,
30,000 30,000.00 30,000.00126. Repairs to Kowloon City wall,
127. Cheung Sha Wan, Forming site for Exchanges,
2,000 1,980.19 19.81 :: 19.81 4,500 4,500.00 4,500.00128. Filling in areas North West of Nan Cheong Street and West of Tai Po Road,
30,000 74.00 29,926.00 29,926.00Waterworks.
129. Kowloon Tong Estate Mains,
5,000130. Distributing Water Mains,
10,000 3,663.32 9,629.48 ...... 1,336.68 370.52 1,336.68 370.52131. Filtered water supply to Dairy Farm Lots at Diamond Hill,
20,000 9,394.27 10,605.73 10,605.73Port Works.
132. Further Reclamation at Sham Shui Po,
133. Cheung Sha Wan, Construction of mound to retain materials dumped,
134. Lai Chi Kok, Water Boat Dock, surfacing to East wall,
60,000 53,817.21 6,182.79 6,182.79 50,000 27,895.98 22,104.02 22,104.02 2,400 1,549.57 850.43 850.43Public Health and Buildings Ordinance.
135. Compensation and Resumptions,
100,000 34,951.77 65,048.23 65,048.23New Territories.
Buildings.
136. Cheung Chau, Anglo Chinese School,
10,000 5,794.47 4,205.53 De a 4,205.53General Works.
137. Roads
2,500 2,309.83 190.17 : 190.17Drainage.
138. Training Nullahs,
1,500 1,355.62139. Miscellaneous Drainage Works,
5,000 3,249.41140. Miscellaneous,
7,500 6,378.90 144.38 1,750.59 1,121.10 144.38141. Waterworks,
1,000 783.02 *** 2,200.00 3,321.10 *** 216.98 1,750.59Communications.
142. Patrol Path from Lin Ma Hang to Sha Tau Kok,.......................
50,000 9,943.60 27,660.97 40,056.40 40,056.40149. Reconditioning Roads,
30,000 2,339.03 2,339.03144. Widening Patrol Path, Sheung Shui to Ta Ku Ling to 10 ft, (Bridge $2,500),
8,500 5,082.35 3,417.65 3,417.65145. Access and Patrol Path to Lo Wu Railway Station Block House...........
4,500 2,477.53 2,022.47 2,022.47146. Widening existing road between Fanling and Sha Tau Kok upon removal of Railway,
10,000 7,078.84 2,921.16 2,921.16147. Tai Po Road Improvement, Bridge at 13 miles,
30,000 30,000.00 *** 30,000.00 :Miscellaneous-
148. Levelling strip of land now occupied by the Railway, Sha Tau Kok.................
149. Forming and surfacing street in front of D. D. C. Lot 827 C, and D. and 828 C,
5,000 1,195.18 3,804.82 -- 3,804.82 2,000150. Magnetic Huts, Au Tau, fencing,
Public Health and Buildings Ordinance.
151. Compensation and Resumptions,
1,600 1,432.88 988.95 567.12 611.05 5,000 2,223.10 2,776.90 3,804.82 567.12 611.05 2,776.90Carried forward
3,419,605 1,791,255.58 332,281.86 1,960,631.28 417,074.00 2,045,423.42