P.W.E. New Kowloon.
Q 96
Size Description Length (in feet) Locality Position Remarks 6" Sewer 56 Shamshuipo 6" 296 6" 6" 6" 255 249 6" 99 6' 6" 35 Cheung Sha Wan In T-lane, N.K.I.L. 1151, Completed. 22 Wong Chuk Street. 150 In scavenging lane, N.K.I.L's. 1140 and 1141. 59 In Un Chau Street to N.K.I.L. 1114. 200 In scavenging lane N.K.I.L. 1082, Cheung Sha Wan Road. 87 In scavenging lane N.K.I.L. 520, Un Chau Street. 77 Shamshuipo scavenging 3 Kowloon City T-lane 15 N.K.I.L. 1150 Cheung Sha Wan Road. In scavenging lane N.K.I.L. 574 Tak Ku Ling Road. 54 In scavenging lane in rear of N.K.I.L's. 1090 and 1029. 6" 36 In scavenging lane in rear of N.K.I.L. 1105. 33The number of drain connections made was 231.
Many new gullies were constructed and connected to the stormwater drainage system.
Estimates, $30,000.00
Supplementary Vote, $29,000.00
$59,000.00
Expenditure, $55,196.23
P.W.E. New Kowloon.
Q 96
Size. Description.
Length (in feet).
Locality.
Position.
Remarks.
6"
Sewer
56
Shamshitipo
6"
296
"
6"
6"
6"
255
وو
249
"7
""
6"
ง
ง
"}
99
6'
6"
35
22
150
59
200
87
Cheung Sha Wan
In T-lane, N.K.I.L. 1151, Completed.
Wong Chuk Street.
In scavenging lane, N.K.
I.L's. 1140 and 1141.
In Un Chau Street to
N.K.I.L. 1114.
In scavenging lane N.K.I. L. 1082, Cheung Sha Wan Road.
In scavenging lane N.K. 1.L. 520, Un Chau Street.
Shamshuipo
In
Kowloon City
A
77
+
scavenging
""
3
>>
""
T-lane
15
N.K.I.L. 1150 Cheung Sha Wan Road.
In scavenging lane N.K. I.L. 574 Tak Ku Ling Road.
In scavenging lane in rear of N.K.I.L's. 1090 and 1029.
54
6"
36
"
"5
In scavenging lane in rear
of N.K.I.L. 1105.
33
The number of drain connections made was 231.
Many new gullies were constructed and connected to the stormwater drainage system.
Estimates,
$30,000.00
Supplementary Vote,
$29,000.00
$59,000.00
Expenditure,
$55,196.23
J