Estimates, Expenditure,
Q 81 P.W.E. New Territories.
M
$40,000.00 $35,104.12
189. Gardeners Quarters at Sheung Shui.-This work was referred to in paragraph 169 of last year's Report.
The Quarters which were completed in 1927 were handed over to the Superintendent of Botanical and Forestry Department early in the year.
1928 Estimates,
$10,000.00
$5,000.00 Total Estimates,
Expenditure up to 31.12.28,
$3,139.81
190. Blockhouse on frontier at Lim Ma Hang.--This work comprised the construction of a concrete Block House for Police enclosed with a barbed wire fence near the Patrol Path between Ta Ku Ling and Lim Ma Hang. In addition a dam was built and the necessary piping laid to provide a water supply to the block house. The building provided accommodation for 8 men.
In June a Contract for $7,108.44 was let to Mr. Tang Tim for the work and by the end of the year it was nearing completion.
Estimates, Expenditure, General Works : $7,500.00 $7,463.00191. Roads. Taipo Market lot No. 829-Filling in, laying macadam to carriageways, tar-painted, and granolithic paving to scavenging lanes was carried out during the year.
Estimates, Expenditure, $500.00 $492.21192. Training Nullahs.-Stormwater channels were laid and malarial swamps were filled in at Taipo.
Estimates, Expenditure, $1,000.00 $757.71193. Miscellaneous Drainage Works.-6" sewer was laid in scavenging lane and the lane behind T.M.L. 829, Taipo Market, and sewer connexions were made.
Estimates, Expenditure, $1,000.00 $531.66Estimates, Expenditure,
Q 81 P.W.E. New Territories.
M
$40,000.00 $35,104.12
189. Gardeners Quarters at Sheung Shui.-This work was referred to in paragraph 169 of last year's Report.
The Quarters which were completed in 1927 were handed over to the Superintendent of Botanical and Forestry Depart- ment early in the year.
1928 Estimates,
$10,000.00
$5,000.00 Total Estimates,
Expenditure up to 31.12.28,
$ 3,139 81
190. Blockhouse on frontier at Lim Ma Hang.--This work comprised the construction of a concrete Block House for Police enclosed with a barbed wire fence near the Patrol Path between Ta Ku Ling and Lim Ma Hang. In addition a dam was built and the necessary piping laid to provide a water supply to the block house. The building provided accommodation for 8 men.
In June a Contract for $7,108.44 was let to Mr. Tang Tim for the work and by the end of the year it was nearing comple- tion.
Estimates, Expenditure,
General Works :
$7,500.00 $7,463.00
191. Roads. Taipo Market lot No. 829-Filling in, laying macadam to carriageways, tarpainted, and granolithic paving to scavenging lanes was carried out during the year.
Estimates, Expenditure,
$500.00 $492.21
192. Training Nullahs.-Stormwater channels were laid and malarial swamps were filled in at Taipo.
Estimates, Expenditure,
$1,000.00
$ 757.71
193. Miscellaneous Drainage Works.-6" sewer was laid in scavenging lane and the lane behind T.M.L. 829, Taipo Market, and sewer connexions were made.
Estimates, Expenditure,
$1,000.00 $ 531.66