P.W.E. Kowloon.
Size. Description.
Length (in feet).
Locality.
Position.
Remarks.
9" Sewer 320 Ma Tau Kok In scavenging lane to K.I.L's. 1674 & 1858. 6" 353 Yau Ma Ti In Battery Street and up to opposite K.I.L. 1697. "" 112 In scavenging lane to K.I.L. 1697. 6" 65 A In scavenging lane to 6" 114 6" 103 Ma Tau Chung In scavenging lane to K.I.L's. 1866 & 1877. 6" 380 Mong Kok In scavenging lane to K.I.L. 1784. 6" 255 19 In scavenging lane to K.I.L. 2087, Nathan Road. 6" 330 Tai Kok Tsui In street and scavenging lane at K.I.L. 1758. 9" & 6"The number of drain connections made was 79.
Many new gullies with flat gully gratings were constructed and connected to the stormwater drainage system.
1927 Estimates, $100,000.00
1927 Expenditure (from Government Funds), $51,164.24
1927 Expenditure (contributions by various lessees), $259.57
$ 51,423.81
Page 555
Page 556
69
P.W.E. Kowloon.
Size. Description.
Length (in feet).
Locality.
Position.
9"
Sewer
320
Ma Tau Kok
6"
353
Yau Ma Ti
""
Remarks.
In scavenging laue to Completed
K.1.L's. 1674 & 1858.
In Battery Street and up to opposite K.I.L. 1697.
"}
6"
112
"
""
In scavenging
lane to
""
A
K.I.L. 1697.
6"
65
"
"
In scavenging
lane to
"7
6"
114
103
K.I.L. 1757.
Ma Tau Chung In scavenging lane to
K.I.L's. 1866 & 1877.
"}
6"
380
Mong Kok
In scavenging
lane to
""
K.I.L. 1784.
6"
255
""
19
In scavenging
K.I.L.
lane 2087, Nathan
to
""
Road.
65
9" &
330
""
Tai Kok Tsui
In street and scavenging
6"
lane at K.I.L. 1758.
The number of drain connections made was 79.
Many new gullies with flat gully gratings were constructed and connected to the stormwater drainage system.
1927 Estimates,
$100,000.00
1927 Expenditure (from Gov-
ernment Funds),
$51,164.24
1927 Expenditure (contribu-
tions by various lessees),.
259.57
$ 51,423.81
Page 555Page 556
No comments yet.
Private notes are available after approval.