P.W.E. Kowloon.
Size. Description.
Length (in feet).
Locality.
Position.
Remarks.
9" Sewer 320 Ma Tau Kok In scavenging lane to K.I.L's. 1674 & 1858. 6" 353 Yau Ma Ti In Battery Street and up to opposite K.I.L. 1697. "" 112 In scavenging lane to K.I.L. 1697. 6" 65 A In scavenging lane to 6" 114 6" 103 Ma Tau Chung In scavenging lane to K.I.L's. 1866 & 1877. 6" 380 Mong Kok In scavenging lane to K.I.L. 1784. 6" 255 19 In scavenging lane to K.I.L. 2087, Nathan Road. 6" 330 Tai Kok Tsui In street and scavenging lane at K.I.L. 1758. 9" & 6"The number of drain connections made was 79.
Many new gullies with flat gully gratings were constructed and connected to the stormwater drainage system.
1927 Estimates, $100,000.00
1927 Expenditure (from Government Funds), $51,164.24
1927 Expenditure (contributions by various lessees), $259.57
$ 51,423.81
Page 555
Page 556