P.W.E. Hong Kong.

64

The following table is an analysis of the total expenditure to the end of the year.

During the

Head of Expenditure. year ended 31st Decem-ber, 1927. Previously. Total to 31st December, 1927. $ $ $ Contract No. 12 of 1921,... 509,665.08 1,434,191.89 1,943,856.97 Dredging, 283.68 95,822.70 96,106.38 Alteration to Existing Sewers, ... 9,285.98 117,556.14 126,842.12 Alteration to Existing Stormwater Drains, Water Mains,.. 7,035.19 175,427.99 182,463.18 121.20 121.20 ... Roads, 10.00 211.98 221.98 4a Reconstruction f Buildings, Royal Naval Arsenal Yard, Salaries and Supervision, Advance Account, Items subsidiary to but not included in Contract No. 12 of 1921, 26,070.73 147,107.35 173,178.08 Bonus payment to Contractor on Contract No. 12 of 1921, 105,541.84 105,541.84 351.63 4,896.30 5,247.93 382,455.71 478,975.92 861,431.63 Total, ...... 985,148.00 2,559,863.31 3,495,011.31

The account in respect of the contribution by the Government towards the Fund for the Reclamation is as follows:—

1927 Estimates, $200,000

1927 Expenditure, $96,069 Expenditure to 31.12.27, $640,460

(b.) Morrison Hill Area Development.-Two hundred and twenty-eight lineal feet of retaining wall averaging twenty feet in height was constructed on the North side of Gap Road Eastwards from the Store Yard of the Public Works Department. One hundred and forty-three lineal feet of rubble embankment was formed for the purpose of widening Gap Road at its junction with Stubbs Road. Gap Road was regraded between Stubbs Road and at a point Westwards about 250 feet distant, necessitating its level being lowered to a maximum depth of 4 feet 6 inches and the construction of a toe-wall 138 feet in length to support the slope on the South side of the road. This work was completed at the end of the year.

Edit History

2026-05-07 21:01:10 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
P.W.E. Hong Kong. 64 The following table is an analysis of the total expenditure to the end of the year. During the Head of Expenditure. year ended 31st Decem-ber, 1927. Previously. Total to 31st December, 1927. $ $ $ Contract No. 12 of 1921,... 509,665.08 1,434,191.89 1,943,856.97 Dredging, 283.68 95,822.70 96,106.38 Alteration to Existing Sewers, ... 9,285.98 117,556.14 126,842.12 Alteration to Existing Stormwater Drains, Water Mains,.. 7,035.19 175,427.99 182,463.18 121.20 121.20 ... Roads, 10.00 211.98 221.98 4a Reconstruction f Buildings, Royal Naval Arsenal Yard, Salaries and Supervision, Advance Account, Items subsidiary to but not included in Contract No. 12 of 1921, 26,070.73 147,107.35 173,178.08 Bonus payment to Contractor on Contract No. 12 of 1921, 105,541.84 105,541.84 351.63 4,896.30 5,247.93 382,455.71 478,975.92 861,431.63 Total, ...... 985,148.00 2,559,863.31 3,495,011.31 The account in respect of the contribution by the Government towards the Fund for the Reclamation is as follows:— 1927 Estimates, $200,000 1927 Expenditure, $96,069 Expenditure to 31.12.27, $640,460 (b.) Morrison Hill Area Development.-Two hundred and twenty-eight lineal feet of retaining wall averaging twenty feet in height was constructed on the North side of Gap Road Eastwards from the Store Yard of the Public Works Department. One hundred and forty-three lineal feet of rubble embankment was formed for the purpose of widening Gap Road at its junction with Stubbs Road. Gap Road was regraded between Stubbs Road and at a point Westwards about 250 feet distant, necessitating its level being lowered to a maximum depth of 4 feet 6 inches and the construction of a toe-wall 138 feet in length to support the slope on the South side of the road. This work was completed at the end of the year.
Baseline (Original)
P.W.E. Hong Kong. 64 The following table is an analysis of the total expenditure to the end of the year. During the Head of Expenditure. year ended Total to 31st 31st Decem- ber, 1927. Previously. December, 1927. $$ $ $ Contract No. 12 of 1921,... 509,665.08 |1,434,191.89 |1,943,856.97 Dredging, 283.68 95,822.70 96,106.38 Alteration. to Existing Sewers, .. 9,285.98 117,556.14 126,842.12 Alteration to to Existing Stormwater Drains, Water Mains,.. 7,035.19 175,427.99 182,463.18 121.20 121.20 ... Roads, 10.00 211.98 221.98 4 a Reconstruction f Build- I ings, Royal Naval Ar- senal Yard, Salaries and Supervision, Advance Account, Items subsidiary to but notincluded in Contract No. 12 of 1921, Bonus payment to Con- tractor on Coutract No. 12 of 1921, 26.070.73 | 147,107.35 } 105,541.84 173,178.08 105,541.84 351.63 4,896.30 5,247.93 382,455.71 478,975.92 861,431 63 Total, ...... 985,148.00 2,559,863,313,495,011.31 The account in respect of the contribution by the Govern- ment towards the Fund for the Reclamation is as follows:— 1927 Estimates, $200,000 1927 Expenditure, $ 96,069 Expenditure to 31.12.27, $640,460 (b.) Morrison Hill Area Development.-Two hundred and twenty-eight lineal feet of retaining wall averaging twenty feet in height was constructed on the North side of Gap Road East- wards from the Store Yard of the Public Works Department. One hundred and forty-three lineal feet of rubble embankment was formed for the purpose of widening Gap Road at its junction with Stubbs Road. Gap Road was regraded between Stubbs Road and at a point Westwards about 250 feet distant, neces- sitating its level being lowered to a maximum depth of 4 feet 6 inches and the construction of a toe-wall 138 feet in length to support the slope on the South side of the road. This work was completed at the end of the year.
2026-05-07 21:01:10 · Baseline
View content

P.W.E. Hong Kong.

64

The following table is an analysis of the total expenditure to the end of the year.

During the

Head of Expenditure.

year ended

Total to 31st

31st Decem- ber, 1927.

Previously. December,

1927.

$$

$

$

Contract No. 12 of 1921,...

509,665.08 |1,434,191.89 |1,943,856.97

Dredging,

283.68

95,822.70

96,106.38

Alteration. to Existing

Sewers,

..

9,285.98

117,556.14 126,842.12

Alteration to

to Existing

Stormwater Drains,

Water Mains,..

7,035.19

175,427.99

182,463.18

121.20

121.20

...

Roads,

10.00

211.98

221.98

4 a

Reconstruction f Build-

I

ings, Royal Naval Ar- senal Yard,

Salaries and Supervision, Advance Account,

Items subsidiary to but

notincluded in Contract No. 12 of 1921,

Bonus payment to Con- tractor on Coutract

No. 12 of 1921,

26.070.73 | 147,107.35

} 105,541.84

173,178.08 105,541.84

351.63

4,896.30

5,247.93

382,455.71

478,975.92

861,431 63

Total, ...... 985,148.00 2,559,863,313,495,011.31

The account in respect of the contribution by the Govern- ment towards the Fund for the Reclamation is as follows:—

1927 Estimates,

$200,000

1927 Expenditure, $ 96,069 Expenditure to

31.12.27,

$640,460

(b.) Morrison Hill Area Development.-Two hundred and twenty-eight lineal feet of retaining wall averaging twenty feet in height was constructed on the North side of Gap Road East- wards from the Store Yard of the Public Works Department. One hundred and forty-three lineal feet of rubble embankment was formed for the purpose of widening Gap Road at its junction with Stubbs Road. Gap Road was regraded between Stubbs Road and at a point Westwards about 250 feet distant, neces- sitating its level being lowered to a maximum depth of 4 feet 6 inches and the construction of a toe-wall 138 feet in length to support the slope on the South side of the road. This work was completed at the end of the year.