P.W.E. Hong Kong.
62
The works executed under the contract were completed in the year 1926, and the period of maintenance expired on the 15th of June, 1927.
$10,000.00 Total Estimates, $185,000.00
1927 Estimates,
....
1927 Expenditure, $5,000.00
Expenditure to 31.12.27,
$163,211.90
129. Praya East Reclamation:—
(a.) Contribution by Government towards Funds for Reclamation.
(b.) Morrison Hill Development.—Retaining Walls and Stormwater Culverts.
This work was referred to in Annexe L at page 164 of last year's Report.
(a.) Filling. The Contractor experienced some difficulty in obtaining suitable filling material from Morrison Hill; however, sufficient quantity had been deposited to satisfy the bonus conditions laid down by the Committee of Engineers. The quantity of filling material deposited in the Reclamation area during the year was about 623,319 cubic yards making a total of 2,869,860 cubic yards. The total area of land formed was approximately 75.03 acres.
Quantities of rock removed from Morrison Hill were utilized to form foundations to the roads traversing the Reclamation in an Easterly and Westerly direction.
Sea-wall. The work of depositing rubble for the foundations was continued, and at the end of the year 4,814 lineal feet of rubble mound was completed. The sea-wall was wholly completed for a length of 4,142 feet, and a further length of 345 feet was partially completed.
On the 14th November a displacement of the sea-wall took place over a distance of about 309 lineal feet. Surveys were undertaken to ascertain the nature of the movement, and the necessary repairs commenced.
P.W.E. Hong Kong.
62
The works executed under the contract were completed in the year 1926, and the period of maintenance expired on the 15th of June, 1927.
$10,000.00 Total Estimates, $185,000.00
1927 Estimates,
....
1927 Expenditure, $ 5,000.00
Expenditure to 31.12.27,
$163,211.90
129. Praya East Reclamation :—
(a.) Contribution by Government towards Funds for
Reclamation.
(b.) Morrison Hill Development.-Retaining Walls and
Stormwater Culverts.
This work was referred to in Annexe L at page 164 of last year's Report.
(a.) Filling. The Contractor experienced some difficulty in obtaining suitable filling material from Morrison Hill; however, sufficient quantity had been deposited to satisfy the bonus condi- tions laid down by the Committee of Engineers. The quantity of filling material deposited in the Reclamation area during the year was about 623,319 cubic yards making a total of 2.869,860 cubic yards. The total area of land formed was approximately 75.03 acres.
Quantities of rock removed from Morrison Hill were utilized to form foundations to the roads traversing the Reclamation in an Easterly and Westerly direction.
Sea-wall. The work of depositing rubble for the foundations was continued, and at the end of the year 4,814 lineal feet of rubble mound was completed. The sea-wall was wholly com- pleted for a length of 4,142 feet, and a further length of 345 feet was partially completed.
On the 14th November a displacement of the sea-wall took place over a distance of about 309 lineal feet. Surveys were undertaken to ascertain the, nature of the movement, and the necessary repairs commenced.