P.W.E, Hong Kong.
Size. Description. Length
Locality.
80
Position.
Remarks.
21" Stormwater drain 18" * 235'0" Queen's College From Leighton Hill Road- Site to a point East of G. L. 38. 171'0" Wong-nei-chong West of I. L. 1386 near Nursing Home, Happy Retreat 21" Sewer 194'6" Whitfield 6" Quarry Bay From Bay View Police Station, North Point, Shaukiwan Road towards Causeway Bay From M. H. in Scav. lune at Q. B. I. L. 4 to Q. B. I. L. 14 " Not completed The number of drain connections was 150.1926 Net Expenditure (from Government funds), 1926 Estimates, $50,000.00
1926 Expenditure (contributions by various fessees), $36,231.44
$7,347.38
$43,578.82
Many new gullies with flat gully gratings were constructed and connected to the stormwater drainage system.
117. Praya East Reclamation Scheme.-The work of re-drainage of the existing developed area between Arsenal Street, Causeway Bay, Queen's Road, East, and the existing Praya, rendered necessary by the Praya East Reclamation Scheme and referred to in paragraph 126 of last year's Report was continued during the year.
The following works were completed:-
Sewers:-
21" in Praya East, from Ship Street to Tai Wong Street West.
6" in Tai Wong Street West.
9" in Gresson Street.
6" in Chan Tong Lane.
9" in Bowrington Road.
9" in Lun Fat Street.
12" on Praya, from Tai Wong Street West to Tai Wong Street East.
9" in Wanchai Road, from Tin Lok Lane to Bowrington Road.
P.W.E, Hong Kong.
Size. Description. Length
Locality.
80
Position.
Remarks.
21"
Stormwater drain
18"
*
235'0" Queen's College From Leighton Hill Road-
Site
to a point East of G. L.
38.
171'0" Wong-nei-chong West of I. L. 1386 near Nursing Home, Happy Retreat
21"
Sewer
194'6"
Whitfield
6"
."
Quarry Bay
From Bay View Police Station, North Point, Shaukiwan Road to- wards Causeway Bay From M. H. in Scav. lune at Q. B. I. L. 4 to Q. B. I. L. 14
"
Not completed
The number of drain connections was 150.
1926 Net Expenditure (from Government
1926 Estimates,
funds),
1926
Expenditure
(contributions
various fessees),
$50,000.00
$36,231.44
by
7,347.38
$43,578.82
Many new gullies with flat gully gratings were constructed and connected to the stormwater drainage system.
117. Praya East Reclamation Scheme.-The work of re- drainage of the existing developed area between Arsenal Street, Causeway Bay, Queen's Road, East, and the existing Praya, rendered necessary by the Praya East Reclamation Scheme and referred to in paragraph 126 of last year's Report was continued during the year.
The following works were completed:-
Sewers:-
21" in Praya East, from Ship Street to Tai Wong Street
West.
6" in Tai Wong Street West.
9" in Gresson Street.
6" in Chan Tong Lane.
9" in Bowrington Road.
9" in Lun Fat Street.
12′′ on Praya, from Tai Wong Street West to Tai Wong
Street East.
9" in Wanchai Road, from Tin Lok Lane to Bowrington
Road.