Q 147
Works not appearing in Estimate,-Hongkong.
supply of furniture including blinds, electric lighting, fans, and radiators to the whole of the 4th and 5th floors and to half of the 6th floor.
It was commenced in August, 1924, and, with the exception of some of the furniture and other sundry minor items, was completed in December, 1924.
1924 Estimates, 1924 Sup. Vote, 1924 Expenditure,
$ 20,000.00
$ 16,091.60
22. Belilios Reformatory.—New Roof and General Repairs to the Fabric including painting and colourwashing.—The entire roofing to the Main Block was renewed. All valleys and gutters were done in malthoid, and the old ceilings removed. This necessitated the main walls of the buildings, originally built to the level of the eaves, to be carried up to the underside of the roof tiling.
General repairs, which were extensively needed, were carried out as far as possible before the end of the year. The whole of the necessary work in this respect will not be completed till the end of April, 1925, owing to the advanced state of dilapidation.
1924 Estimates,
1924 Expenditure,
$ 14,827.81
221. Government Civil Hospital, “B” Block,—Extension and Improvements to Kitchen Block.—This work comprised the construction of an extra storey on top of the present one-storey building to provide accommodation for 7 amahs, with splints and linen rooms in addition to bath, kitchen, and Water Closet.
Rooms on the ground floor now in the occupation of amahs, would be vacated for extensions and improvements to the kitchen.
The work was commenced at the end of October,
1924 Estimates,
1924 Expenditure,
$ 4,576.94
222. Refuse Pier at Whitfield for Sanitary Department.—This work which comprised the erection of a reinforced concrete pier for the Sanitary Department and the surfacing of the approach road was completed by the end of the year.
1924 Estimates,
1924 Expenditure,
$20,000.00 $ 18,724.20
223. Construction of a Dump for surplus material at Wanchai Gap. For the provision of a dump for surplus building material
Q 147
Works not appearing in Estimate,-Hongkong.
supply of furniture including blinds, electric lighting, fans, and radiators to the whole of the 4th and 5th floors and to half of the 6th floor.
It was commenced in August, 1924, and, with the exception of some of the furniture and other sundry minor items, was completed in December, 1924.
1924 Estimates, 1924 Sup. Vote, 1924 Expenditure,
$ 20,000.00
$ 16,091.60
22. Belilios Reformatory.—New Roof and General Repairs to the Fabric including puinting and colourwishing.-lhe entire roofing to the Main Block was renewed. All valleys and gutters were done in malthoid, and the old ceilings removed. This necessitated the main walls of the buildings, originally built to the level of the eaves, to be carried up to the underside of the roof tiling.
General repairs, which were extensively needed, were carried out as far as possible before the end of the year. The whole of the necessary work in this respect will not be completed till the end of April, 1925, owing to the advanced state of delapidation.
1924 Estimates,
1924 Expenditure,
$ 14,827.81
221. Government Civil Hospitul, “B” Block,—Extension and Improvements to Kitchen Block.—This work comprised the cons- truction of an extra storey on top of the present one-storey building to provide accommodation for 7 amahs, with splints and linen rooms in addition to bath, kitchen, and Water Closet.
Rooms on the ground floor now in the occupation of amahs, would be vacated for extensions and improvements to the kitchen.
The work was commenced at the end of October,
1924 Estimates,
1924 Expenditure,
$ 4,576.94
222. Refuse Pier at Whitfield for Sanitary Department.—This work which comprised the erection of a reinforced concrete pier for the Sanitary Department and the surfacing of the approach road was completed by the end of the year.
1924 Estimates,
1924 Expenditure,
$20,000.00 $ 18,724.20
223. Construction of a Dump for surplus material at Wanchai Gap. For the provision of a dump for surplus building material