P.W.E. Hongkong.
Q 100
180. Miscellaneous Drainage Works :-
(a). Extending existing outfall from below Wanchai Gap to the sea at a point near Aberdeen.—This work, referred to in paragraph 122 (a) of last year's Report, was completed at the end of the year.
1924 Estimates, $20,000.00
1924 Expenditure, $14,193.57
(b). Laying sewer in connection with Conduit and Hatton Roads Development Scheme. This work, referred to in paragraph 122 (b) of last year's Report, was not proceeded with during the year; there was consequently no expenditure under this heading.
(c). Shaukiwan Road.-- Laying drain in connection with North Point Foreshore Development. This work referred to in paragraph 122 (d) of last year's Report was continued.
1924 Estimates, $20,000.00
1924 Expenditure, $6,314.69
(d). General Works.-Owing to receipt of unsatisfactory tenders, most of the 6" & 9″ sewers, &c. were laid departmentally, the larger works being let by contract. The following are the most important stormwater drains and sewers which were laid during the year :-
Size Description Length in feet Locality Position Remarks 6" Sewer 1,365'0" Pokfulam Barker Road 6" 1,520'0" Victoria Road 6" 1,860'0" Victoria Road R.B.L. 160 & adjacent lots Completed 6" 2,160'0" New Motor Road From Peak Tramway Terminus to a point opposite R.B.L. 97 L.Ls. 2348, 2355 & 2357 to the sea 6" 635'0" Stubbs Road From Wanchai Gap along Stubbs Road 395'0" in the direction of Magazine Gap 6" From Stubbs Road to "Cadzow" R.B.L. 66 6" 1,297'0" Bowen Road From Stubbs Road to From Bowen Road to R.B.L. 193 6" 691'0" Sai Wan Ho In scavenging lane at rear of S.I.Ls. 481 & 482P.W.E. Hongkong.
Q 100
180. Miscellaneous Drainage Works :-
(a). Extending existing outfall from below Wanchai Gap to the sea at a point near Aberdeen.—This work, referred to in paragraph 122 (a.) of last year's Report, was completed at the end of the year.
1924 Estimates,
1924 Expenditure,..
$20,000.00 $14,193.57
(b). Laying sewer in connection_with_Conduit and Hatton Roads Development Scheme. This work, referred to in paragraph 122 (6.) of last year's Report, was not proceeded with during the year; there was consequently no expenditure under this heading.
(c). Shaukiwan Road.-- Laying drain in connection with North Point Foreshore Development. This work referred to in paragraph 122 (d) of last year's Report was continued.
1924 Estimates,
1924 Expenditure,....
$20,000.00 $ 6,314.69
(d). General Works.-Owing to receipt of unsatisfactory tenders, most of the 6" & 9′′ sewers, &c. were laid departmentally, the larger works being let by contract. The following are the most important stormwater draius and sewers which were laid during the year :-
Size. Description.
Length in feet.
Locality.
Position,
Remarks.
6"
Sewer
6"
""
1,365'0" 1,520'0"
Pokfulam Barker Road
6"
29
1,860'0" Victoria Road Victoria Road
6"
""
6"
"
R.B.L. 160 & adjacent lots Completed From Peak Tramway Ter- minus to a point opposite R.B.L. 97
L.Ls. 2348, 2355 & 2357
to the sea
2,160′0′′ New Motor Road From Wanchai Gap along
635'0" Stubbs Road
395'0"
"+
Stubbs Road in
in the direction of Magazine
Gap
From Stubbs Road to
"Cadzow"
R.B.L. 66
"T
39
6#
6"
"
A
From Stubbs Road to
"
1,297'0" Bowen Road
From Bowen Road to
R.B.L. 193
J+
6"
691'0"
"
Sai Wan Ho
In scavenging lane at rear of
S.I.Ls. 481 & 482
""