158. Miscellaneous Water Works.-The following is a statement of the expenditure for the work carried out under this heading
(1.) Lugard Road Extension, $1,911.70
(2.) Gough Hill Extension, 1,688.13
(3.) Unforeseen Works, 2,978.71
(4.) Minor Extensions to Mains, .78
$6,579.32
(1.) A 2″ pipe 3,000 ft. in length was laid from the Peak Service Reservoir to Lugard Road for the water supply to houses on Lugard Road Extension. (2.) A 3″ pipe 1,700 ft. in length was laid round Gough Hill for the water supply to houses in that district. (3.) Unforeseen Works included:—
(a.) Clearing, &c., for survey work in connection with proposed Catchwaters.
(b) Increasing the size of the Service Mains in Kennedy Town District to give a better Fire Service.
1923 Estimates, $11,000.00
1923 Sup. Vote, $12,000.00
$23,000.00
1923 Expenditure, $11,712.65
Praya East Reclamation Scheme.
159. (a.) Contribution by Government towards Fund for Reclamation.—The above item was referred to in paragraph 141 (a) of last year's Report.
One hundred additional side-tipping wagons were delivered on the works and in use by July.
Satisfactory progress was made with the depositing of earth filling from Morrison Hill; in addition to the transport line viâ Bowrington Canal, a track was laid on Heard Street, and the transport of filling material by locomotives and side-tipping wagons viâ the latter route was commenced in March. A total of about 800,000 cubic yards of filling material was deposited on the Reclamation Area by the end of the year.
The dredging of a length of about 2,500 feet of trench, and the filling in of same with rubble was completed in February. Dredging operations under this Contract were then suspended, as it was considered desirable that the rubble mound should be completed to the sea-wall foundation levels. Owing, however, to the stone-collecting coolies' strike which commenced in July and was not settled at the end of the year, the amount of rubble received was not sufficient to complete the mound to the desired levels,
P.W.E. Hongkong.
Q 100
158. Miscellaneous Water Works.-The following is a state- ment of the expenditure for the work carried out under this
heading
(1.) Lugard Road Extension,
..$1,911.70
(2.) Gough Hill Extension,....
1,688.13
(3.) Unforeseen Works,.....
2,978.71
(4.) Minor Extensions to Mains,.......
.78
$6,579.32
(1.) A 2′′ pipe 3,000 ft, in length was laid from the Peak Service Reservoir to Lugard Road for the water supply to houses on Lugard Road Extension. (2.) A 3" pipe 1,700 ft. in length was laid round Gough
Hill for the water supply to houses in that district. (3.) Unforeseen Works included :—
(a.) Clearing, &c., for survey work in connection
with proposed Catchwaters.
(b) Increasing the size of the Service Mains in Kennedy Town District to give a better Fire Service.
1923 Estimates,.
1923 Sup. Vote,
1923 Expenditure,
,$ 11,000.00 12,000.00
$ 23,000.00
$ 11,712.65
Praya East Reclamation Scheme.
159. (a.) Contribution by Government towards Fund for Re- clamation.—The above item was referred to in paragraph 141 (a of last year's Report.
One hundred additional side-tipping wagons were delivered on the works and in use by July.
Satisfactory progress was made with the depositing of earth filling from Morrison Hill; in addition to the transport line viâ Bowrington Canal, a track was laid on Heard Street, and the transport of filling material by locomotives and side-tipping wagons viâ the latter route was commenced in March. A total of about 800,000 cubic yards of filling material was deposited on the Reclamation Area by the end of the year.
The dredging of a length of about 2,500 feet of trench, and the filling in of same with rubble was completed in February. Dredging operations under this Contract were then suspended, as it was considered desirable that the rubble mound should be completed to the sea-wall foundation levels. Owing, however, to the stone-collecting coolies' strike which commenced in July and was not settled at the end of the year, the amount of rubble received was not sufficient to complete the mound to the desired levels,