P.W.E. Hongkong.

until the beginning of October. By the end of the year, fair progress had been made, and a length of about 1,500 feet of the catchwater had been completed.

1923 Estimates,............. $20,000.00
1923 Expenditure,...... $4,011.18

147. 18″ Main over portion of section between Albany and Elliott Filter Beds.-This work was referred to in paragraph 131 of last year's Report.

Owing to the lateness of the Spring rains, it was not possible to recommence this work, until late in June, but by October a length of 1,346 feet had been relaid in 18" pipes from Albany to Peak Road which completed the work under this Vote.

This unfiltered main now consists of a length of 1,346 feet of 18" pipe from Albany to Peak Road, a length of 4,754 feet of 12" pipe from Peak Road to the junction of Bonham Road and High Street, and a length of 4,100 feet of 18" pipe from this point to the Elliott Filter Beds.

1923 Estimates,.....$35,000.00 | Total Estimates,. $115,000.00
1923 Expenditure, $19,428.54 | Total Expenditure,...$19,428.54

148. New Workshop and Plant.-This work was referred to in paragraph 132 of last year's Report.

As Government was not able to allocate a new site for a Workshop, it was decided to erect some of the new machines, and put them in operation in the existing building.

The following new machines have been erected and are now in use :-

One 16" S, S. & S. C. Lathe,
One 10½" do. do.,
One Radial Drilling Machine,
One Power Joist Sawing Machine,
One Belt Driven H. P. Fan,
One Deadweight Gauge Tester.

Several other new machines arrived, but it was not found possible to erect them as no space was available.

1923 Estimates, $10,000.00 | Total Estimates,...$25,000.00
1923 Sup. Vote,..... $35,000.00
1923 Expenditure, ...$28,961.62 Total Expenditure, $30,107.35

Page 615

Page 616

Edit History

2026-05-07 05:42:46 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
P.W.E. Hongkong. until the beginning of October. By the end of the year, fair progress had been made, and a length of about 1,500 feet of the catchwater had been completed. 1923 Estimates,............. $20,000.00 1923 Expenditure,...... $4,011.18 147. 18″ Main over portion of section between Albany and Elliott Filter Beds.-This work was referred to in paragraph 131 of last year's Report. Owing to the lateness of the Spring rains, it was not possible to recommence this work, until late in June, but by October a length of 1,346 feet had been relaid in 18" pipes from Albany to Peak Road which completed the work under this Vote. This unfiltered main now consists of a length of 1,346 feet of 18" pipe from Albany to Peak Road, a length of 4,754 feet of 12" pipe from Peak Road to the junction of Bonham Road and High Street, and a length of 4,100 feet of 18" pipe from this point to the Elliott Filter Beds. 1923 Estimates,.....$35,000.00 | Total Estimates,. $115,000.00 1923 Expenditure, $19,428.54 | Total Expenditure,...$19,428.54 148. New Workshop and Plant.-This work was referred to in paragraph 132 of last year's Report. As Government was not able to allocate a new site for a Workshop, it was decided to erect some of the new machines, and put them in operation in the existing building. The following new machines have been erected and are now in use :- One 16" S, S. & S. C. Lathe, One 10½" do. do., One Radial Drilling Machine, One Power Joist Sawing Machine, One Belt Driven H. P. Fan, One Deadweight Gauge Tester. Several other new machines arrived, but it was not found possible to erect them as no space was available. 1923 Estimates, $10,000.00 | Total Estimates,...$25,000.00 1923 Sup. Vote,..... $35,000.00 1923 Expenditure, ...$28,961.62 Total Expenditure, $30,107.35 Page 615 Page 616
Baseline (Original)
-Q 97 P.W.E. Hongkong. until the beginning of October. By the end of the year, fair progress had been made, and a length of about 1,500 feet of the catchwater had been completed. 1923 Estimates,............. 1923 Expenditure,...... $20,000.00 $ 4,011.18 147. 18′′ Main over portion of section between Albany and Elliott Filter Beds.-This work was referred to in paragraph 131 of last year's Report. Owing to the lateness of the Spring rains, it was not possible to recommence this work, until late in June, but by October a length of 1,346 feet had been relaid in 18" pipes from Albany to Peak Road which completed the work under this Vote. This unfiltered main now consists of a length of 1,346 feet of 18" pipe from Albany to Peak Road, a length of 4,754 feet of 12" pipe from Peak Road to the junction of Bonham Road and High Street, and a length of 4,100 feet of 18" pipe from this point to the Elliott Filter Beds. 1923 Estimates,.....$35,000.00 | Total Estimates,. $115,000.00 1923 Expenditure, $19,428.54 | Total Expenditure,...$ 19,428.54 148. New Workshop and Plant.-This work was referred to in paragraph 132 of last year's Report. As Government was not able to allocate a new site for a Workshop, it was decided to erect some of the new machines, and put them in operation in the existing building. The following new machines have been erected and are now in use :- One 16" S, S. & S. C. Lathe, One 101⁄2" do. do., One Radial Drilling Machine, One Power Joist Sawing Machine, One Belt Driven H. P. Fan, One Deadweight Gauge Tester. Several other new machines arrived, but it was not found possible to erect them as no space was available. 1923 Estimates, 1923 Sup. Vote,..... $10,000.00 | Total Estimates,...$ 25,000.00 $35,000.00 1923 Expenditure, ...$28,961.62 Total Expenditure, $30,107,35 Page 615Page 616
2026-05-07 05:42:46 · Baseline
View content

-Q

97

P.W.E. Hongkong.

until the beginning of October. By the end of the year, fair progress had been made, and a length of about 1,500 feet of the catchwater had been completed.

1923 Estimates,.............

1923 Expenditure,......

$20,000.00 $ 4,011.18

147. 18′′ Main over portion of section between Albany and Elliott Filter Beds.-This work was referred to in paragraph 131 of last year's Report.

Owing to the lateness of the Spring rains, it was not possible to recommence this work, until late in June, but by October a length of 1,346 feet had been relaid in 18" pipes from Albany to Peak Road which completed the work under this Vote.

This unfiltered main now consists of a length of 1,346 feet of 18" pipe from Albany to Peak Road, a length of 4,754 feet of 12" pipe from Peak Road to the junction of Bonham Road and High Street, and a length of 4,100 feet of 18" pipe from this point to the Elliott Filter Beds.

1923 Estimates,.....$35,000.00 | Total Estimates,. $115,000.00 1923 Expenditure, $19,428.54 | Total Expenditure,...$ 19,428.54

148. New Workshop and Plant.-This work was referred to in paragraph 132 of last year's Report.

As Government was not able to allocate a new site for a Workshop, it was decided to erect some of the new machines, and put them in operation in the existing building.

The following new machines have been erected and are now in use :-

One 16" S, S. & S. C. Lathe,

One 101⁄2"

do.

do.,

One Radial Drilling Machine,

One Power Joist Sawing Machine,

One Belt Driven H. P. Fan,

One Deadweight Gauge Tester.

Several other new machines arrived, but it was not found possible to erect them as no space was available.

1923 Estimates,

1923 Sup. Vote,.....

$10,000.00 | Total Estimates,...$

25,000.00

$35,000.00

1923 Expenditure, ...$28,961.62 Total Expenditure, $30,107,35