P.W.E. New Territories.
Q 78
(e.) Improvements to Coastal Road as far as Lai Chi Kok to fit it for 3-ton refuse tractors.—The Coastal Road, from the junction of Taipo Road to Lai Chi Kok, was macadamized and tar-painted throughout, cement concrete margins being formed where found desirable.
1921 Estimates.... $15,000.00
1921 Expenditure,.......... 14,945.49
(f.) General Works.-The following is a brief statement of the principal works carried out under this heading :-
The work of surfacing, kerbing, and channelling the main road at Taipo Market between Taipo Road and Taipo Market Station referred to in paragraph 151(7) of last year's Report was completed.
A considerable amount of road and footways had to be formed in connection with and in order to keep pace with the development of the Kowloon Bay Reclamation Scheme. The roads were channelled and surfaced with macadam, the footways being kerbed and paved with granolithic slabs.
The following roads, all in Shamshuipo District, were kerbed, channelled, and surfaced with ordinary macadam, and tar-painted, the footpaths being paved with granolithic slabs, and any necessary improvements being made in front of new buildings erected during the year:-
Haitan Street,
Lai Chi Kok Road, Kweilin Street, Tai Nan Street.
Ki Lung Street,
Nan Chang Street, Yu Chau Street, Yee Kuk Street, Pei Ho Street, Boundary Street,
N.K.I.L. 200,
1921 Estimates, $20,000.00
1921 Sup. Vote, 50,000.00
$70,000.00
1921 Expenditure, 39,486.76
163. Training Nullahs :
(a.) Training main stream at Laichikok.-This work referred to in paragraph 152(6) of last year's Report was proceeded with but was not completed by the end of the year.
1921 Estimates,.. $40,000.00
1921 Expenditure,... 10,362.38
(b.) General Works.-The extension of the Nanchang Street Nullah to Aplin Street, referred to in paragraph 152(e) of last year's Report...
P.W.E. New Territories.
Q 78
(e.) Improvements to Coastal Road as far as Lai Chi Kok to fit it for 3-ton refuse tractors.—The Coastal Road, from the junction of Taipo Road to Lai Chi Kok, was macadamized and tarpainted throughout, cement concrete margins being formed where found desirable.
1921 Estimates....
1921 Expenditure,..........
$15,000.00 14,945.49
(f.) General Works.-The following is a brief statement of the principal works carried out under this heading :-
The work of surfacing, kerbing, and channelling the main road at Taipo Market between Taipo Road and Taipo Market Station referred to in paragraph 151(7) of last year's Report was completed.
A considerable amount of road and footways had to be formed in connection with and in order to keep pace with the development of the Kowloon Bay Reclamation Scheme. The roads were channelled and surfaced with macadamn, the footways being kerbed and paved with granolithic slabs.
The following roads, all in Shamshuipo District, were kerbed channelled, and surfaced with ordinary macadam, and tar painted, the footpaths being paved with granolithic slabs, and any necessary improvements being made in front of new buildings erected during the year:~
Haitan Street,
Lai Chi Kok Road, Kweilin Street, Tai Nan Street.
Ki Lung Street,
Nan Chang Street, Yu Chau Street, Yee Kuk Street, Pei Ho Street, Boundary Street,
N.K.I.L. 200,
1921 Estimates,
$20,000.00
1921 Sup. Vote,
50,000.00
$70,000.00
1921 Expenditure,
39,486.76
163. Training Nullahs :
(a.) Training main stream at Laichikok.-This work referred to in paragraph 152(6) of last year's Report was proceeded with but was not completed by the end of the year.
1921 Estimates,..
1921 Expenditure,...
$40,000.00 10,362.38
(b.) General Works.-The extension of the Nanchang Street Nullah to Aplin Street, referred to in paragraph 152(e) of last